Enerdrive POWER SYSTEM Series Installation Manual

Enerdrive POWER SYSTEM Series Installation Manual

Advertisement

Quick Links

POWER SYSTEM SERIES
Installation Guide
Congratulations on the purchase of your Archie power system from Enerdrive. This all-in-one system
was designed for those who want the best charging, power supply and monitoring package in one
compact portable package. Your system includes the following individual products:
Enerdrive 12V 100AH eLITE Lithium Battery (Optional 12V 125AH B-TEC Lithium Battery)
Enerdrive DC2DC40+ DC Battery Charger with Blue Anderson vehicle charge input and Red
Anderson solar charge input.
Enerdrive ePOWER 600W Inverter
Enerdrive ePRO PLUS Battery Monitor
2 x Twin USB Outlets, 3 x DC Outlets, 2 x 50A Anderson Style Outlets

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the POWER SYSTEM Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Enerdrive POWER SYSTEM Series

  • Page 1 POWER SYSTEM SERIES Installation Guide Congratulations on the purchase of your Archie power system from Enerdrive. This all-in-one system was designed for those who want the best charging, power supply and monitoring package in one compact portable package. Your system includes the following individual products: •...
  • Page 2 INSTALLATION GUIDE Mounting • Consideration must be given to avoid moisture and excessive dust. • If you choose to x Archie into a semi permanent location use the supplied mounting brackets. • Slide each bracket into the slots located on the front and back of Archie. •...
  • Page 3 INSTALLATION GUIDE Solar Connection • Using a genuine "red" Anderson plug, connect your unregulated solar panels directly into Archie. Use of portable folding panels are recommended when Archie will be used in a portable application. When installed in a vehicle the use of xed panels may be preferred. Refer to the Speci cations table for maximum solar panel rating.
  • Page 4 INSTALLATION GUIDE Battery Reset Archie is tted with a Battery Reset switch. This allows a at battery to be "jump started" from the main/start vehicle battery, when connected. 1. Turn o ALL DC and AC loads 2. Ensure the "DC2DC" circuit breaker on the back of Archie is turned on. 3.
  • Page 5 INSTALLATION GUIDE Archie - Enerdrive Wiring...
  • Page 6 INSTALLATION GUIDE Archie - Capabilities Portable Regrigerator Battery Charger Mobile Phone Vehicle Start Battery GoPro 240W Folding Solar Panel Kit Air Compressor...
  • Page 7 Enerdrive warrants that its Products will be free from defects in materials and workmanship (subject to limits, and in normal conditions, as described in the complete Enerdrive Warranty Policy) for up to 5 years from the date of purchase.
  • Page 8 ENERDRIVE PTY LTD P.O. Box 9159, Wynnum Plaza, Queensland, Australia 4178 Ph: 1300 851 535 / Fax: 07 3390 6911 Email: support@enerdrive.com.au Web: www.enerdrive.com.au...

This manual is also suitable for:

Power system archieK-archie

Table of Contents