Prior To Operation; Continuous Drainage - Haverland DES19 User Manual

Hide thumbs Also See for DES19:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 22

Prior to Operation

• Supply power should be in correspondence with the value on the nameplate, power outlet needs to
be earthed.

Continuous Drainage

In general, water will be collected by the tank, if you want continuous drainage, please follow these
1. Unplug the drainage outlet plug.
2. Insert the drainage pipe with 19mm inner diameter into water outlet.
Please always make sure the pipe is facing down, that is not blocked or bended.
5

Advertisement

Table of Contents
loading

Table of Contents