Download Print this page

Ortech ODD Supreme Series Instruction Manual page 3

Advertisement

ODD Supreme Series
MODEL
ODD-400 | ODD-500
INSTALLATION GUIDE
Assembly Instructions
3..
Install duct work and junction box
Remove junction box cover and secure conduit or
stress relief to junction box knock-out hole.
Using connectors, connect house power wires to
ventilating fan wires (refer to the wiring diagram on
this page CONNECT ELECTRICAL WIRING section)
replace the junction box cover.
Squeeze the ductwork to fit the adapter then slip
onto the adapter and secure it with duct tape (not
included), secure all the ductwork connections so
that they are air tight.
The ducting from this fan to the outside of building has a strong effect on the air flow, noise and energy use of the fan.
Use the shortest, straightest duct routing possible for best performance, and avoid installing the fan with smaller ducts than
recommended. Insulation around the ducts can reduce energy loss and inhibit mold growth. Fans installed with existing
ducts may not achieve their rated air flow.
Connect Electrical Wiring
Run 120V AC house wiring to the location of the fan. Use only UL-approved connectors (not included) to attach to the house
wiring to the wiring plate. Refer to the wiring diagram below, and connect the wires as shown.
Install Grille
Install ceiling material to complete the ceiling
construction. Then, cut around the fan housing.
To attach the grille assembly to the fan housing, pinch
the grille springs on the side of the grille assembly, and
position the grille into the housing with the grille
springs in the appropriate slots.
Push the grille assembly towards the ceiling to secure.
info@ortechindustries.com
www.ortechindustries.com
13376 Comber Way
375 Admiral Blvd
Mississauga
Surrey BC V3W 5V9
,
ON L5T 2N1
Instruction Manual
1-888-543-6473
1-888-541-6474

Advertisement

loading

This manual is also suitable for:

Odd-400Odd-500