2-2
Before shipment, this instrument was in-
spected and found to be free of mechanical and
electrical defects.
As soon as the instrument is
unpacked, inspect for any damage that may have
occurred in transit,
Save all packing materials
until the inspection is completed.
If damage is
found, proceed as described in the Claim for
Damage in Shipment section of the warranty page
at the rear of this manual.
2-3
MECHANICAL CHECK
2-4
This check should confirm that there are no
broken knobs or connectors, that the cabinet and
panel surfaces are free of dents and scratches,
and that the meter is not scratched or cracked.
2-5
ELECTRICAL CHECK
2-6
The instrument should be checked against
its electrical specifications.
Section V includes
an "in-cabinet" performance check to verify proper
instrument operation.
2-7
INSTALLATION DATA
2-8
The instrument is shipped ready for bench
operation.
It
is necessary only to connect the in-
strument to a source of power and
it
is ready for
operation.
2-9
LOCATION
2-10 This instrument is air cooled.
Sufficient
space should be allotted so that a free flow of
cooling air can reach the sides and rear of the in-
strument when
it
is in operation.
It
should be used
in an area where the ambient temperature does not
exceed ssoc.
2-11 RACK MOUNTING
2-12 This instrument may be rack mounted in a
standard 19 inch rack panel either alongside a
similar unit or by itself.
Figures 2-1 and 2-2
show how both types of installations are accom-
plished.
-