Do you have a question about the PrepRite PVS27-6-1 and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Everidge PrepRite PVS27-6-1
Page 1
Tabletop Vacuum Sealing Machine Operation and Care and Maintenance Manual PVS27-6-1 PVS32-8-1 PVS32G-8-1 PVS42-12-1 PVS42G-12-2 PVS42GP-12-1 PVS52-25-1 PVS52-25-2 PVS52G-25-2 This appliance is for commercial use only...
Page 2
To avoid electrical shock, this appliance MUST be adequately grounded in accordance with local electrical codes or, in the absence of local codes, with the current edition of the national Electrical Code ANSI/ NFPA no. 70. In Canada, all electrical connections are to be made in accordance with CSA C22.1, Canadian Electrical Code Part 1 or local codes.
Page 3
These appliances are heavier than they look and should be moved with proper equipment and personnel. To reduce the risk of electric shock and injury to persons, unplug from the power supply before servicing. This appliance must service by qualified service personnel. Failure to properly maintain and service to this appliance can and will cause injury or even death.
Page 4
Regulatory references CHAPTER 1 The following manual CONFORMS TO Operation and Care Manual ANSI/UL Std. 963 – CERT. TO CAN/CSA Std.C22.2 No. 68 – CONFORMS TO NSF 169 The operation and care manual is a document Disposal of this appliance after its issued by the manufacturing company and is an useful life.
CHAPTER 3 and conform by all statements and policies of the OneSolutionSupport service. WARRANTY 5. During the warranty period, we will pay, not to exceed, one (1) hour PrepRite Inc. warrants to the original travel and fifty (50) miles travel. All purchaser only that any original part that is warranty service will be performed by found to be defective in material or...
End User obligations Location To ensure proper operation of this appliance and The end user must immediately inform the its components, this appliance must be installed manufacturer of any safety system defect and/or on a stable and level surface, away from high any malfunction he or she is aware of.
Controls and inspections injection time (if the appliance is equipped with this option.). 4. Position the bag (or bags) with product in Before starting the appliance, check the oil level the chamber, the polyethylene shelves can through sight glass located be used inside the vacuum chamber to level motor/pump.
sealing operation, the chamber should be wiped Gas Distribution out with a damp cloth. Should it be needed (i.e. Nozzle bags inner product pours out of the bag), it is Sealing recommended to use a damp cloth and mild detergent, rinsing thoroughly. Sealing Bag Cross Section Of Chamber (Fig.
Page 9
Table 1. EXAMPLES OF PACKAGING WITH INERT GAS INJECTION OPTION OXYGEN CARBON DIOXYDE NITROGEN % PRODUCT % (O2) % (CO2) (N2) Sliced salami Roast meat Biscuits and oven products Coffee Fresh meat 70/80 30/20 Dehydrated meat and spices Minced meat Chocolate Fresh cheese / Mozzarella 20/-...
CHAPTER 7 Main Power Switch O-I OPERATION LCD display ON/OFF: to switch on the Control and LCD display. Control Display SET: to enter the program mode (vacuum, Description. sealing and gas). + or -: to select the desired program and to To start a sealing cycle, push the main power increase decrease...
7.1.3 User setting menu 7.1.4_Program setting Switch the machine on by pressing the button To enter the user setting mode, first turn on the ON/OFF. The following will appear in the main power switch and then push and hold both screen: the ON/OFF button and the SET button for 5 seconds.
pause, until the time set has elapsed. When set to 0, the pump will run continuously for the time set. 4. Printer Label Settings Vacuum Type 0: standard vacuum. (PRINTER OPTION) Vacuum Type soft vacuum with By pressing the SET button, the following intermittent pump activated.
CHAPTER 8 MAINTENANCE AND SERVICE Pump heating The pump maintenance is not strictly linked to the 10,000 cycles, but more If the ambient temperature is below 60 degrees dependent on the product used (i.e. flour, F, it is advisable to pre-heat the pump in the breading, liquids, the oil check must be morning in order to liquefy the oil before it done monthly).
Page 14
2. Wipe off the silicone sealing bar gasket on 4. Replacement of the Clear Chamber the bell-lid (Fig 8.2) every day with a damp Bell-Lid Gasket. cloth and mild detergent. Replacement of Teflon Sealing Bar The sealing bar needs to be replaced by a qualified service technician.
CHAPTER 9 THE MACHINE WORKS PROPERLY BUT THE BAG IS NOT SEALED OR IS NOT SEALED CORRECTLY AT LID OPENING PROBLEMS SOLVING 1. Unplug appliance from power AFTER SWITCHING ON THE MAIN 2. Lift the Teflon sealing bar up to ensure the POWER SWITCH, THE SWITCH DOES 2 cables are firmly attached.
Page 16
CHAPTER 10 CONFIGURATION AND NAME PLATE AND TECHNICAL CONSUMPTION DETAILS Image 8.5. Name plate example...
Need help?
Do you have a question about the PrepRite PVS27-6-1 and is the answer not in the manual?
Questions and answers