Page 1
SIZZLER MOBILE GAS BRAAI ASSEMBLY INSTRUCTIONS Please read these instructions carefully before assembly and retain them for future reference SIZZLER / MOBILE / ROTISSERIE SMB-310 SMB-410...
Important Information For the USER: Warning: If you already own a Chad-O-Chef Sizzler: A qualified gas installer must replace the compression elbow inlet on the manifold with the supplied hose-tail connector. Only clean the unit with hot soapy water and never with any abrasive materials.
Page 4
Igniting and Turning off the Sizzler Gas Braai WARNING: If at anytime during the igniting process, or during use, you smell gas, immediately turn off the gas supply to the appliance at both the Burner Control Knobs and the shut off valve on the Gas Bottle. If you suspect that there is a gas leak, DO NOT use the appliance until it has been checked and/or serviced by a qualified gas service technician Open all gas supply valves.
Page 5
Safety Notes and Maintenance procedures WARNING: If you suspect that there is a gas leak, DO NOT use the appliance until it has been checked and/or serviced by a Qualified Gas Service Technician This appliance is designed for outdoor use only, as per SANS 1539 ...
Total Parts List Base Panel Screw (M5) 16x 12mm 41x 10mm Castor Wheel Side Panel Mid Panel Rear Cover Panel 1 Gas Bottle Bracket Chain L&R Door Hinge pin...
Page 9
Magnet Right Hand Counter Cutting Board Sizzler (Sizzler Box) Top Grids (Sizzler Box) Hose Tail Connector Gas Hose & Regulator Left Hand Counter Rear Cover Panel 2 Rotisserie Dome (Optional extra) (Rot. Box)
Page 10
Assembly Instructions Base Panel Assembly 4x M5x12 Pan head bolts with M5 washers affix each Castor -wheel (4)to Base Panel...
Page 11
Side and Mid Panel Assembly 4x M5x10 Pan head bolts affix each Side Panel (2) to Mid...
Page 12
Rear Cover Panels Assembly 3x M5x10 Pan head bolts affix Gas bottle bracket to Back 4x M5x10 Pan head bolts af- fix Rear Cover Panel 2 to 6x M5x10 Pan head bolts af- fix Rear Panel 1 to Side...
Page 13
Body and Door Assembly 8x M5x10 Pan head bolts affix Body assembly to Base Panel 4 Hinge Pins locate into holes in the doors Note orientation of Hinge Pin holes in Base panel and Mid panel when assembling Body and Door assembly...
Page 14
Right Hand Counter Assembly 9x M5x10 Pan head bolts affix Right Hand Counter onto Side Panel...
Page 15
Sizzler, Hose & Regulator Assembly Sizzler Grill easily retrofits onto Mid Panel * Refer to Sizzler user manual for grill assembly instructions * A Qualified Gas Installer must replace the compression elbow inlet on the manifold with the supplied hose-tail connector.
Page 16
Left Hand Counter and Cutting Board Assembly Rotate LH Counter, in order to slip flange underneath Sizzler Top panel...
Page 17
9x M5x10 Pan head bolts affix Left hand Counter to Side Prep Board easily drops into place, in the RH Counter...
Page 18
Rotisserie Dome Assembly (if applicable) Remove Top Grids from Sizzler in order to retrofit Rotisserie Dome onto Supports within the Sizzler Gas Braai (Reinsertion optional)