Page 1
OPERATION MANUAL Power Proportional Distribution Software MODEL DCS002A71 The above intelligent Touch Controller is available separately. Thanks for your having purchased our product, Power Proportional Distribution Card. This operation manual contains notes for safe use of the product. For correct use, be sure to read this manual carefully before use.
DISTRIBUTION REPORT..........6 leaks, fire or other damage to the equipment. Be sure only to use accessories made by Daikin which are spe- 8. TROUBLESHOOTING ...........10 cifically designed for use with the equipment and have 9.
• Do not turn off the power immediately after stopping [Precautions] operation. This system calculates electricity consumptions by size of Always wait at least five minutes before turning off the power. indoor units, run time, expansion valves open gap, suction rate Otherwise, water leakage and trouble may occur.
PREPARATION INITIAL SETUP 3-1 Checking Attachments 5-1 Power Proportional Distribution Main Menu Power Proportional Distribution Card includes the following Settings of power proportional distribution is made via the sys- attachments. tem setup menu. To display the system setup menu, press the S button at the bottom on the screen.
Page 5
5-2 How to set Exclusion Periods (Normal Type) This function is only for normal type, and exclusion periods where power proportional distribution calculation is not carried out and week days can be set. For example, it can be used when to collect fixed charges during day time in week days and carry out power proportional distribution calculation only for overtime work and holiday work.
5-3 Special Calculation Days (Normal Type) POWER PROPORTIONAL DISTRIBU- Even in the case where Exclusion Periods (Normal Type) is set, TION REPORT OUTPUT PROCEDURES it is available to set a day when power proportional distribution Here are descriptions of procedures to output monthly Power calculation is specially carried out all the day (0:00 - 24:00).
HOW TO OUTPUT POWER PROPOR- • Case to designate month In month designation, Power Proportional Distribution Report TIONAL DISTRIBUTION REPORT can be read in unit of one month. And by designating the cal- 7-1 Display of Power Proportional Distribution Report culation days, Power Proportional Distribution Report for a month from the designated calculation day of previous month There are 2 methods to display Power Proportional Distribution...
Page 8
In case the power proportional distribution report is missing, • Display in unit of zone the display indicates the list of missing data (day / month / When Zone is selected, the total of Power Proportional Distri- year / time). The list indicates up to a maximum of 100 cases. bution Report of indoor units registered in zone is displayed.
Page 9
7-2 Saving Files CAUTION Power Proportional Distribution Report can be saved. When to The minimum of 12 months to the maximum of 12 months and print out Power Proportional Distribution Report, when to dis- 30 days of the power proportional distribution results data can play electric power amount in unit of tenant, and when to con- be retained.
Page 10
(Example) 2. File format: When the data from 25 Oct. 2000 to 24 Nov. 2000 are (Example) totalled, the results are indicated as PPD Hourly Data (Wh) “20001025_20001124. CSV”. If the file of the same name Note:,Date and Time mean the calculation time of PPD. already exists, it overwrites.
TROUBLESHOOTING Cause and counter Symptom measures Cause and counter How to change zone registration? To change zone registration Symptom measures for change of insertion and so “Pwr Prp Dist” is not displayed. Power Proportional Distribu- forth in the middle of month, tion function is not set yet.
AFTER-SALES SERVICE After-sales Service • To have the product repaired, prepare the following information • Model • Date of installation • Circumstances - as detailed as possible • Address, name, phone number • Transfer Transfer requires professional technique. Be sure to contact the supplier you purchased the product from or service sta- tion.