Download Print this page

HSS Hire 68613 Operating & Safety Manual

Pipe joint crimping set

Advertisement

Quick Links

Each pipe connector has a pair of raised ridges
which locate within a recess in the crimping jaws. One
ridge for each side of the connector.
Prepare the pipe by removing burrs and reaming the
edge with the tool provided. Place the connector onto
the pipe and place the jaws over the ridge on the pipe
side of the connector.
Keep the safety inching switch pressed until the pressing
is finished and the pressing tongs or rings are completely
closed. After completion of pressing. the drive unit
switches over automatically to retraction. This is indicated
by an acoustic signal (click).
Crimping
Open
Pipe
Fitting
Pressure Monitoring
The pressure is monitored during pressing in the REMS
Akku-Press 22V ACC. Upon completion of the pressing
process, the pressure indicator LED lights white if the
pressure is within specification. If this lights red, the
pressure was less than specified. If it lights red and the
drive unit is switched off, the pressure was greater
than specified. Hold the reset button until the pressing
rollers have moved back completely. If the pressure was
out of specification, a new pressing process can be started
and the pressure indicator LED then lights white again
during the pressing process. After a dwell time of
approx. 2 minutes, the LED goes out but lights up
again, when the drive unit is switched back on. If the
pressure indicator LED lights red. it is recommended to
return the equipment to your local HSS depot.
EQUIPMENT CARE
Never push the equipment beyond its design
limits. If it will not do what you want with reasonable
ease and speed, assume you have the wrong tool for the
job. Contact your local HSS Hire Shop for advice. Keep the
equipment clean - you will find this less of a chore if you
clean it regularly, rather than wait until the end of the
hire period.
When not in use, store the equipment somewhere
clean, dry and safe from thieves.
FINISHING OFF
Disconnect the battery and place with the charger in
the carry case.
Remove the fitted jaw and place the de-burrer, jaw and
unit in the carry case ready for return, to your local HSS
Closed
Hire Shop.
...any comments?
If you have any suggestions to enable us to improve the
information within this guide please email your comments
©HSS Hire Service Group Plc 2020 No. 417/02
76 Talbot Road, Old Trafford, Manchester, M16 0PQ
...any comments?
to safety@hss.com
http://www.hss.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the 68613 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for HSS Hire 68613

  • Page 1 Place the connector onto job. Contact your local HSS Hire Shop for advice. Keep the the pipe and place the jaws over the ridge on the pipe equipment clean - you will find this less of a chore if you side of the connector.
  • Page 2 If it shows signs of damage or excessive wear, return it to (Residual Current-Operated Device) available from your your local HSS Hire Shop. local HSS Hire Shop, or power the charger from a mains circuit with a built-in RCD. ELECTRICAL SAFETY...