FBS FLOOR BOX SYSTEMS
25060 Hancock Ave
STE 103-125
Murrieta, CA 92562
1-800-216-8307
IMPORTANT: Please read carefully the following instructions before beginning.
OLD WORK
Unscrew the four screws at the
bottom of the box to remove
leveling feet.
4
Pour concrete. Hand toweling near box edges is
suggested once concrete has been poured.
6
Install the desired floor covering material (ter-
razzo, tile, limestone,carpet, etc) on the floor.
Questions?
Questions?
Questions?
C 0 1 - Ins t a lla t ion Ins t r uc t ions -
1
Determine box location and
position in accordance to floor
plans.
Adjust the leveling screws until
the desired level is met.
7
Wire devices in accordance with the NEC.
Attach faceplates to mounting panels.
1.800.216.8307
1.800.216.8307
1.800.216.8307
2
Attach conduits to the selected
knockouts.
Install temporary cover to pre-
vent debris from entering the
box during concrete pour. Duct
tape any cracks or seams
where concrete may enter.
5
Once con-
crete has
cured, remove
temporary
cover. Locate
and pull wires.
3
Fix and secure box to the
floor.
If necessary, use concrete
mixture below and around box
to level the box in accordance
to the final floor level desired.
Caution:
Wire devices in accordance
with the NEC.
If you are not sure about
existing conductor wires,
color coding, polarity and
circuit feed contact a
licensed electrician.
www.FloorBoxSystems.com
www.FloorBoxSystems.com
www.FloorBoxSystems.com

Advertisement

loading

Summary of Contents for FBS C01

  • Page 1 FBS FLOOR BOX SYSTEMS 25060 Hancock Ave C 0 1 - Ins t a lla t ion Ins t r uc t ions - STE 103-125 Murrieta, CA 92562 1-800-216-8307 IMPORTANT: Please read carefully the following instructions before beginning. Determine box location and...
  • Page 2 FBS FLOOR BOX SYSTEMS 25060 Hancock Ave C 0 1 - Ins t a lla t ion Ins t r uc t ions - STE 103-125 Murrieta, CA 92562 1-800-216-8307 DISCLAIMER - (Worldwide) FBS Floor Box Systems makes no warranties or rep-...