VENTILATED DRY TYPE TRANSFORMERS
INSTALLATION, OPERATION&
MAINTENANCE MANUAL

Advertisement

loading

Summary of Contents for Maddox MIT100-15A

  • Page 1 1-800-270-2011 - WWW.MADDOXTRANSFORMER.COM 1601 SE COMMERCE AVE. BATTLE GROUND WA 98604 303 GREER DR. SIMPSONVILLE SC 29681 VENTILATED DRY TYPE TRANSFORMERS INSTALLATION, OPERATION& MAINTENANCE MANUAL...
  • Page 2 TRANSFORMER MUST BE PROPERLY GROUNDED BEFORE SHOULD BE REFERRED TO THE NEAREST SALES OFFICE ENERGIZING. OF THE MADDOX INDUSTRIAL TRANSFORMER. INTRODUCTION This instruction manual details information about installing, operating, and maintaining ventilated dry type transformers. Each transformer has its own specification and unique construction features. These features are detailed in the transformer outline and nameplate drawings.
  • Page 3 MIT100-15A RECEIVING parts that will prevent the core and coil assembly Upon receipt of the transformer, inspect as follows: from being removed from the case. All high voltage and low voltage line connections must be removed Review the shipping papers to ensure the shipment is complete.
  • Page 4: Installation

    5°C. The number and size of air outlets required will depend on their distance above the transformer, and concrete. MADDOX recommends that you do not place the on the efficiency and load cycle of the apparatus. See ANSI Guide transformer directly on an earthen surface.
  • Page 5 MIT100-15A that the spring washer and flat washer should be placed on the nut TORQUE CHART on the eye-bolt and the bar. The table below serves as a guide or suggestions for nominal torque When connecting bus bars, be sure the joints are properly aligned values for bolted electrical connections.
  • Page 6: Fan Cooling

    If acceptance test is part of customer approval process then To inspect the transformer, de-energize, lockout and properly MADDOX recommends doing Applied potential or AC Hi-pot test @ ground all circuits supplying power to the transformer and 75 % of the actual ANSI levels.
  • Page 7: Terms And Conditions

    The “Terms and Conditions” are available online at www.maddoxtransformer.com WHEN YOU NEED SERVICE If you need service on products manufactured by Maddox we are ready to serve you. Contact the nearest Sales Office for more information. RENEWAL PARTS Address orders for renewal parts to the nearest Sales Office of the Maddox.