Page 1
Standard Media Manager V2 55256 55257 with Overbridge Control Console Standard Media Manager V2 Media Manager V2 with Overbridge Control Console, with LH drawer, Heavy-Duty casters and surround LH drawer and Heavy-Duty casters 55253HDS 55256HD shown with optional insert panel (shaded)
If servicing is necessary, please contact Spectrum Industries for assistance. Warning - Relocating audio and/or video equipment to furniture not specifi cally designed to support audio and/or video equipment may result in death or serious injury due to the furnishing collapsing or over turning onto a child.
Page 3
1/4-20 x 5/8” Note: The rack rails are factory-installed in PHM screws the Media Manager on the side opposite (2 per bracket) the document camera drawer. Media Manager V2 section view rack rails and brackets in right position Figure 2A...
Page 4
Quick-release door hinge operation To remove door: Open door wide enough to be able to access the quick-release hinge. Support door with one hand. With other hand, push-down on the quick-release hinge lever until the upper hinge pin clears the upper hinge pin hole. Figure 3A. Hold the quick-release hinge lever down while tipping the top of the door away from the lectern.
Cord management 4mm hex wrench The audience-side logo panel can be removed to provide access to internal wiring. 1. Remove the (6) 1/4-20 x 15mm JC bolts and remove the panel. Figure 4A. 2. Cords can be accessed through the two openings behind the panel. 3.
Page 6
Overbridge insert panel (overbridge models only) Note: The insert panel shown (shaded) is not included with the lectern or over- bridge. This option needs to be ordered separately to complete the overbridge. drill drill bit jigsaw or router 1. To remove the overbridge insert panel, remove the (2) 1/4-20 x 35mm JC bolts with a 4mm hex wrench and lift out the panel.
Page 7
Note: The Overbridge Control Console has been designed for many of the currently available con- trollers on the market, however, modified cutouts should be reviewed by Spectrum to ensure clear- ance of brackets, keyboard slides, or other objects under the worksurface. overbridge section view Note: The insert panel shown (shaded) is not included with the lectern or overbridge.
Page 8
Floor anchoring (Toe kick versions only) 4mm hex drill wrench 1. If your Media Manager is equipped with a toe kick, and you wish to attach it to the floor, the toe-kick will need to be detached from the lectern. To detach, remove the (4) 1/4-20 x 35mm JC bolts (one on each corner) from inside the lectern.
Page 9
Caster operation brake lever 1. To lock the caster rotation, press the brake lever. Figure 8. 2. To resume operation, lift up on brake lever. Figure 8 Moving and parking the lectern • Before moving, unplug and secure all power cords. •...
Page 10
Vertical installation: 6RU The cord reel is intended to provide temporary access to electrical outlets for Spectrum mobile lecterns. Check local electrical codes prior to installation. Flat Panel Monitor Arms and Tablet Mounts (See the Spectrum website or catalog for the latest...
Rack-mount accessories Cantilever Shelf (2RU) Cantilever Shelf (3RU) Pull-Out Shelf (2RU) Pull-Out Shelf (3RU) 17.5”W x 18”D x 3.5”H 17.5”W x 18”D x 5.25”H 16.5”W x 17.75”D 16.5”W x 21.75”D (50 lbs max load) (80 lbs max load) (50 lbs max load) (80 lbs max load) 97504 97502...
This warranty is exclusive; no other warranty, written or oral, is expressed or implied. This warranty is given by Spectrum to Buyer and to no other per- son or legal entity. No Spectrum dealer, distributor, agent or employee is authorized to make any modification or addition to this warranty.