Maintenance; General Maintenance; Maintenance Schedule - VERDER CARBOLITE GERO LHT 6/30 Installation, Operation And Maintenance Instructions

600c laboratory high temperature oven
Table of Contents

Advertisement

6.0   Maintenance

6.0 Maintenance

6.1

General Maintenance

Preventive rather than reactive maintenance is recommended. The type and frequency
depends on the product use; the following are recommended.
6.2

Maintenance Schedule

CUSTOMER
QUALIFIED PERSONNEL
DANGER! ELECTRIC SHOCK. Risk of fatal injury. Only electrically
qualified personnel should attempt these maintenance procedures.
Maintenance
Procedure
Safety
Over-Temperature Safety Circuit
(if fitted)
Over-Temperature Safety Circuit
(if fitted)
Door Seal
Door Seal
Air Vent
Electrical Safety (external)
Electrical Safety (internal)
Function
Temperature Calibration
Operational Check
Operational Check
Performance
16
Method
Set an over-temperature setpoint lower
than the displayed temperature and
check for an over-temperature alarm as
detailed in this manual
Electrical measurement
Visual inspection - check for splits or fray-
ing
Replacement
Check and clean if necessary
Visual check of external cables and plugs
Physically check all connections and clean-
ing of the power plate area
Tested using certified equipment, fre-
quency dependent on the standard
required
Check that all functions are working nor-
mally
Thorough inspection and report incor-
porating a test of all functions
Frequency
Daily Weekly Monthly
Bi-
Annually
Annually

Advertisement

Table of Contents
loading

This manual is also suitable for:

Carbolite gero wv-11-01Carbolite gero ws-10-01

Table of Contents