Download Print this page
APG Exhibits CSNR-43FS Setup Instructions

APG Exhibits CSNR-43FS Setup Instructions

Advertisement

Quick Links

Step 1: Assemble all straight pipes
with bungee cords by pushing and
pulling together.
Step 5: Move to the center of cable
and hand tighten remaining turn
buckle to remove any remaining
slack. Do not over tighten.
USE DROP CLOTH
TO PROTECT GRAPHICS:
Unfold drop cloth and place on
smooth flat surface. Install graph-
ics on top of drop cloth to keep
clean. Do not walk on plastic or
graphics with dirty shoes.
Step 2: Connect all corner sections
to straight sections of the frame by
matching color on pipes.
Step 3: Build two outer frames and
connect top and bottom frames
together in the corners with small
connecting pipes.
Step 6: Start in one corner of the
frame and push the silicone edge
of graphic into the inside groove.
Insert for 4-6 inches in both direc-
tions. Repeat on all corners.
Top of graphic is side with cable.
CSNR-43FS
Step 4: At the top of the frame
attach cable to left and right side.
Tighten or loosen with hand pull.
x2
Step 7: Continue inserting silcone
edge of graphic into the frame
working towards the center of
frame on each side. Do not over pull
or stretch.

Advertisement

loading
Need help?

Need help?

Do you have a question about the CSNR-43FS and is the answer not in the manual?

Questions and answers

Summary of Contents for APG Exhibits CSNR-43FS

  • Page 1 CSNR-43FS Step 1: Assemble all straight pipes Step 2: Connect all corner sections Step 3: Build two outer frames and Step 4: At the top of the frame with bungee cords by pushing and to straight sections of the frame by connect top and bottom frames attach cable to left and right side.
  • Page 2 CSNR-43FS Step 8: Completed graphic frame Step 9: Flip frame and graphic over. Step 10: Take out the LED Lights Step 11: Attach Light Array at top for front side. Note: make sure you are using and gently unroll on the graphic of frame onto wire harness clips.
  • Page 3 CSNR-43FS Step 16: Insert feet into 4 corners Step 17: Attach two LED Light Step 18: With display in upright Step 19: Move display into position of the frame base. Arrays to one power supply. Stand position, insert silicone edge of...