Installation - Amazon B07GDXCX87 Manual

Barn door hardware 8 ft - j shape - black
Table of Contents

Advertisement

Available languages

Available languages

Installation

Step 1: Track Preparation
Door height +
1.75" (44 mm)
NOTICE
If your door opening DOES NOT have trim going around it, follow the below
steps.
1. Using the layout above as reference, position the track where you would like it.
2. Using a stud finder, locate the studs where you want to attach the track.
3. Using a small nail, tap it into the drywall and make sure you have located the stud.
4. Using a pencil, mark the location of the stud.
5. Repeat steps 2 and 3 until you have six marks indicating you have found six wall studs.
6. Place the track on the wall and make sure the six pencil marks on the wall match up with the
six holes in the track.
7. If the holes in the track DO ALIGN with the marks on the wall, proceed to Track Installation.
8. If the holes in the track DO NOT ALIGN with the marks on the wall, then a header board will
need to be used.
2" (51 mm) minimum
on one side of
the door
Door
Floor
Keep level
Header board
(1 x 6 recommended)
Floor clearance:
Using the dimensions
shown will allow for a
3/8" (9.5 mm) space
between the door
Door opening
and floor.
5

Advertisement

Table of Contents
loading

Table of Contents