Download Print this page

Sealey MC390AH Instructions page 2

Motorcycle lift 390kg air/hydraulic

Advertisement

3. AssEMbLY
Unpack the lift and check contents with list below. Should there be any damaged or missing parts, contact your supplier immediately.
NOTE! All numbers refer to fig.1.
Contents
·Main Assembly
·Sliding Plate
·Lift Foot Pedal
·Release Foot Pedal
3.1.
Place the sliding plate (36) on the platform (35) to cover the rear wheel removal aperture.
3.2.
Attach loading plate (37) to end of platform using washers (23) and Cotter-pins (04).
3.3.
Fit the front wheel vise assembly (34) to the front of the platform using bolts (33), washers (23) and nuts (30).
3.4.
Fit the baffle plate (32) using bolts (33), washers (23) and nuts (30).
3.5.
Fit the lift foot pedal (11) to the pump piston spindle (09) and fit the release foot pedal (10) to the release valve spindle(05).
fig.1
4. AIR sUPPLY
4.1.
You will require an air pressure of minimum 120psi, maximum 200psi to get the best performance from this lift.
4.2.
 WARnInG! Ensure the air supply does not exceed 200psi while operating the lift. Too high an air pressure and unclean air will shorten the
product's life due to excessive wear, and may be dangerous, causing possible damage and/or personal injury.
4.3.
Drain the air tank daily. Water in the air line will damage the lift.
4.4.
Clean the air inlet filter screen weekly.
4.5.
Keep the air hose between the compressor and the lift as short as possible, and install an air filter and oiler (fig 2).
4.6.
Line pressure should be increased to compensate for unusually long air hoses (over 8 metres). The minimum hose
diameter should be 1/4" I.D. and fittings must have the same inside dimensions.
4.7.
Keep hose away from heat, oil and sharp edges. Check hoses for wear, and make certain that all connections
are secure.
·Loading Plate
·Vise
·Locking Bar
·Bolts, Washers, Nuts, Cotter-Pins.
Original Language Version
fig.2
MC390AH
Issue: 2 - 16/10/09

Advertisement

loading