Advertisement

Quick Links

User manual
Gaming 980B - SKYTOWER

Advertisement

Table of Contents
loading

Summary of Contents for LC-POWER Gaming 980B-SKYTOWER

  • Page 1 User manual Gaming 980B - SKYTOWER...
  • Page 2: Table Of Contents

    Content Chapter 1 Product introduction 1.1 Specification..................03 1.2 Accessory..................04 Chapter 2 Installation guide 2.1 Side panel assembly................05 2.2 Motherboard installation..............06 2.3 5,25” device installation................07 2.4 3,5” device installation..............08-09 2.5 2,5” device installation................10 2.6 PSU installation..................11 2.7 Fan installation................. 12-13 2.8 Water cooling installation..............13-14 2.9 Front panel control &...
  • Page 3: Chapter 1 Product Introduction

    Thank you for purchasing the “Gaming 980B - SKYTOWER” case from LC-Power. Please read this manual before usage. Specifications may be subject to change without prior notice. Chapter 1 Product introduction Specification Dimension 238(w)x 545(h)x 573(d)mm Material Steel (SECC) Front & top panel:ABS + meshed designed 5,25”...
  • Page 4: Accessory

    CPU cooler up to 190 mm Accessory Accessory box contents: 1x user manual, 1x screw bag Standoff Screw Screw Screw 5H-6#*4- 6#*6.5HCu M3*5 6*5KM 3*8*8PWA 10PCS 20PCS 24PCS 4PCS Plastic hand screws Screw Cable tie Cable tie 6#-32 6#6HW-TC L=120mm L=150mm 10PCS 4PCS...
  • Page 5: Chapter 2 Installation Guide

    Chapter 2 Installation guide Side panel assembly Remove the side panel: Remove the screws on the back of the chassis and open the side panel. Reattach the side panel: Align the side panel with hook holes to close the side panel. Fix it with screws.
  • Page 6: Motherboard Installation

    2.2 Motherboard installation Screw the standoffs on the holes for the motherboard installation bracket. 2. Install the motherboard in a proper location and fix it with the provided screws. Note: CPU, RAM and any peripheral installation steps are not included in this manual. Please refer to your motherboard manual for related mounting instructions .
  • Page 7: 5,25" Device Installation

    2.3 5,25” device installation Remove the 5,25” drive cover from the chassis by pushing it inside out. Now put the 5,25” ODD into the drive bay. 2. Fix the 5,25” ODD with the quick release screws on the side.
  • Page 8: 3,5" Device Installation

    2.4 3,5” device installation Open the side panel with the help of the latch. Push the latch of the drive bay and take out the 3,5” drive bay tray. Place an HDD into the drive bay tray and secure it on the bottom of the tray with the provided screws.
  • Page 9 Connect the backplane to the motherboard with the help of SATA cables. Note: The user may choose the direction of the 3,5” drive cage. This will help the user to arrange the chassis placement flexibly. Please refer to the pictures below for the further information.
  • Page 10: 2,5" Device Installation

    2.5 2,5” device installation Gaming 980B provides three positions for the 2,5” HDD/SSD installation. Two HDDs/SSDs on the side of the 5,25” drive cage and one HDD/SSD under the 3,5” HDD cage location. Open the side panel with the help of the latch. Place the 2,5”...
  • Page 11: Psu Installation

    PSU installation Place the PSU in a proper location and fix it with the provided screws. (Screw holes enable a PSU mounting from both sides; fan up or down) 2. Place the power supply cables behind the mainboard tray. 3. To clean the dust filter, pull out the washable dust filter which is placed under the power supply location.
  • Page 12: Fan Installation

    Fan installation Bottom fan installation 1. Remove 6 screws as shown below and then remove the bottom bracket. 2. Install the fan inside the chassis and secure the screws from the bottom side. You can install maximum two 120 mm fans on the bottom panel. Top panel fan installation 1.
  • Page 13: Water Cooling Installation

    Install the fans on the top of the case and use screws to fix them to the matching holes. You can install maximum three 120 mm or two 140 mm fans on the top of the chassis. 2.8 Water cooling installation the back side of the case you will find pre-drilled water cooling holes.
  • Page 14: Front Panel Control & I/O Installation

    2.9 Front panel control & I/O installation Please refer to the following table for front panel control & I/O ports.  Item Description Item Description Power on/off Reset USB 3.0 port USB 2.0 port Audio & mic Please refer to the following illustration of the front I/O connectors and your ...
  • Page 15 Front I/O Connector Motherboard Case cable connector USB 3.0 USB 2.0 AC’97 HD Audio...
  • Page 16 The product has a two year warranty period from the date of purchase, service issues will be handled by your dealer. If the case is damaged due to improper operation, the warranty period expires immediately. Check www.lc-power.com or contact us by e-mail at support@lc-power.com. Silent Power Electronics GmbH Formerweg 8 47877 Willich...

Table of Contents