Initial Preparations; Guidelines - Bosch EX49N Installation Instructions Manual

“no-grip” high impact dome night vision camera
Table of Contents

Advertisement

INITIAL PREPARATIONS

Determine the operating voltage at the
installation site. The camera's Voltage
Regulator Board accepts either +12V dc or
24V ac input.
See Section 2, Input Power Connections.
Determine the optimum location for the
camera. Section 3, Mounting-Camera Base.
All cameras have been tested prior to
shipment. After the wiring has been
reconnected, it is advisable to check the
camera's operation before installation.
ESD protection – Cameras and circuit boards
are sensitive electronic components. It is
recommended to wear a ground strap to
ground any static charge. (Alternative: touch a
grounded metal plate for at least a minute
before proceeding with any disassembly)

GUIDELINES

The installation of the EX49N camera is explained
in Sections 1 to 5 listed below. It is important that
these steps are followed in sequence:
1.
Dome Removal
2.
Input Power Connections
3.
Mounting – Camera Base
4.
Camera /LED Adjustments
5.
Camera Re-Assembly
3

Advertisement

Table of Contents
loading

Table of Contents