Checking Engine Deck Height
1. Disengage the PTO and set the parking brake.
2. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Adjust the tire pressure in all tires to specifications on
page 32.
4. Measure engine deck height at location A (Fig. 51).
5. Measure engine deck height at location B (Fig. 51).
6. If the height at location A and B are not the same,
change tire pressure slightly to make them the same.
3
A
4
2
Figure 51
1. Back view of machine
2. Top of engine deck
3. Tires
1
5
2
3
4. Location A, 1–5/16 inch
(33 mm) 1/4 inch (6 mm)
5. Straight edge
6. Carrier frame cross tube
3
B
1
4
m–7549
4. Same height at locations
A and B
Checking Carrier Frame Front–to–Rear
Pitch
The carrier frame must have a pitch of a 1/4 inch (6 mm)
over the length of 24 inches (61 cm) on the carrier frame
(Fig. 52).
1. Measure out 24 inches (61cm) on the carrier frame
(Fig. 52).
2. Measure carrier frame height at location A (Fig. 52).
3. Measure carrier frame height at location B (Fig. 52).
4. The height at location A must be a 1/4–3/8 inch
(6 mm –10 mm) lower than location B (Fig. 52).
5. If the carrier frame is not correct, move caster spacers
to make it a 1/4–3/8 inch (6 –10 mm) pitch (Fig. 52).
Move spacers from top or bottom to make the correct
pitch.
6. The tire pressure may also be adjusted slightly to make
a 1/4 inch (6 mm) pitch.
5
3
5
A
1
1. Caster Wheel
2. Carrier Frame
3. 1/4–3/8 inch
(6 mm–10 mm) pitch over
24 inch (61 cm) length
Checking Carrier Frame Side–to–Side
1. Disengage the PTO and set the parking brake.
2. Stop the engine, remove the key, and wait for all
moving parts to stop before leaving the operating
position.
3. Adjust the tire pressure in all tires to specifications on
page 32.
4. Measure carrier frame height at location A (Fig. 53).
5. Measure carrier frame height at location B (Fig. 53).
37
24 inch
(61cm)
B
4
2
4
Figure 52
4. Height at locations A
and B
5. Caster spacers
m–6370

Advertisement

Table of Contents
loading

This manual is also suitable for:

30327

Table of Contents