Biasi M110.24SM/E Service Manual page 28

Wall hung, fan flue, room sealed, high efficiency gas boiler
Hide thumbs Also See for M110.24SM/E:
Table of Contents

Advertisement

Gas valve
6
Unscrew the screws N and remove the valve
(Fig. 11.11).
7
Reassemble the valve carrying out the removal
operations in reverse order.
Fig. 11.10
Before to fit a new valve it is advisable to pre-- set it
as hereafter explained.
8
Remove the brass plug and turn the plastic screw
1 (Fig. 11.2) fully clockwise until it stops. Do not
overtight.
9
Turn it counter---clockwise 2 and 3/4 turns.
26
10
After any service operation on the components of
the gas circuit check all the connections for gas
leaks.
L
M
Fig. 11.11
Adjust the gas valve using the flue analyser as de-
scribed in section 11.3.
Warning: After cleaning or replacement as
detailed above, it is deemed necessary to
undertake a combustion analysis as detailed
in chapter 11.3 section 11.
N

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M110.32sm/e

Table of Contents