LG CM 9520 Series Service Manual page 21

Hide thumbs Also See for CM 9520 Series:
Table of Contents

Advertisement

ORDER OF ASSEMBLY FOR MECHANISM DECK
Figure 5
5) After setting the Main PCB Assy on the Base Main,
tighten the screw.
(Set the part accurately on the hook)
Solder the Motor Jump Wire on the PCB set on the
Base Main.
1
2
1
1
5
6) Set the Base Sled Assy on the Base Main.
(When setting the part, assemble with the CAM part of
the Guide UD inserted in two locations of the Boss of
Frame UD)
Align the FFC to the Guide and connect the FFC
Cable.
2-8
2
3
4
Figure 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cms9520fCms9520sCms9520w

Table of Contents