Download Print this page

Leader Evaporator Inferno Quick Start Manual

Wood fired arch

Advertisement

Quick Links

Inferno Wood Fired Arch
Leader Evaporator Co., Inc.
49 Jonergin Drive
Swanton, Vermont 05488
(802) 868-5444
www.leaderevaporator.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the Inferno and is the answer not in the manual?

Questions and answers

Summary of Contents for Leader Evaporator Inferno

  • Page 1 Inferno Wood Fired Arch Leader Evaporator Co., Inc. 49 Jonergin Drive Swanton, Vermont 05488 (802) 868-5444 www.leaderevaporator.com...
  • Page 2 Directions for an Inferno Wood Fired Arch Preparing the Sugarhouse There are some major decisions that go into planning and preparing a sugarhouse for a quick and smooth set up. Two of these decisions are: How much space do I need? What kind of foundation do I need?
  • Page 3 Table A-1 Evaporator No. of Pails of Evaporator No. of Pails of Size Bricks Cement Size Bricks Cement 30 X 8 4 X 12 3 X 8 4 X 14 3 X 10 5 X 12 3 X 12 5 X 14 40 X 10 5 X 16 40 X 12...
  • Page 4 Figure A-1 For Raised Flue Arches The baffles prompt some interesting methods of insulating; however we require that you brick the front of the first baffle. In between the two baffles is where there may be some options. It is recommended that you fill the space with a light weight, pourable, insulating material to within 2 inches of the top.
  • Page 5 Optionally you can fill between the baffles if you choose, however it is not required. If you fill between the baffles, the center baffle is not required. It is highly recommended to insulate any portions of the cast iron front possible, especially the sides of the door opening.
  • Page 6 Putting up the stack The first thing to do is make sure you have the right amount of stack and that it is the right size according to table A-3. Table A-3 Arch Size Taper Height Stack Diameter Total Round Stack Feet Inches Feet...
  • Page 7 Setting up the Forced Draft System Thanks to some innovation to the Inferno wood fired arches the only thing to do with the forced draft system is to wire it up. A couple things to keep in mind: install both a speed control and an on/off switch for each fan, use only copper or copper clad wire, and turn off the power to the circuit that you are working on.
  • Page 8 copper is completely covered. Make sure every connection is secured with electrical tape. Mount the control in the wall box with the 2 long metal screws provided. Restore power to the circuit breaker or fuse, and adjust the low-end fan speed as follows: 1.
  • Page 9: Maintenance

    are coming out the doors simply turn down the second blower using the speed control. When you have finished firing turn all of the blowers back to their appropriate levels. What is the appropriate level? Well it varies from arch to arch. The easiest way to set your speed controls is to use the stack temperature.