Download Print this page
Argos 01COR0909DDWW-V1 General Instructions Manual
Argos 01COR0909DDWW-V1 General Instructions Manual

Argos 01COR0909DDWW-V1 General Instructions Manual

9x9 corner shed

Advertisement

Quick Links

General Instructions
01COR0909DDWW-V1
9x9 Corner Shed
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01COR0909DDWW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Argos 01COR0909DDWW-V1

  • Page 1 Please retain product label and instructions for future reference All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 01COR0909DDWW-V1 9x9 Corner Shed BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION...
  • Page 2 01COR0909DDWW-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 2917mm Panel Frame - 28x28x2780mm Depth = 2917mm FS2828-2780mm Height = 2146mm Panel Frame - 28x28x1600mm Base Dimensions: FS2828-1600mm Width = 2800mm Depth = 2800mm Door Strip - 30x12x1720mm QTY 2...
  • Page 3 Please retain product label and instructions for future reference Pre Assembly Step 2 Before beginning assembly remove the Lay the door panel (No. 1) transportation blocks from the bottom at and lay the doors (No. of each panel. Each panel should have 12) into the aparature.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Place the rst two lrg and sml gable sections Place the window panel (No. 2) together (the illustration starts with the left - onto the oor against the No’s 4 &...
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 *It is recommended that Place the panel frames (No’s. Before xing the two roof you cut the felt before 16 & 17) on top of the plain panels (No’s.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Step 13 Place the assembled roof section onto Cut the felt into four the building ensuring the roof framing sheets, 2x 430cm, 1x 350cm sits equally around the outside.
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 15 Arrange the cover trims (No’s. 22, 23 & Fix the fascia’s (No’s. 19, 24) around the building as shown in the 20 & 21) around the illustration. Secure each trim into building using 40mm position using 3x30mm screws.
  • Page 8: After Treatment

    Please retain product label and instructions for future reference Step 17 Fix the remainig door blocks (No. 27) to the reverse of a door with 2x30mm screwing through the front of the door into the blocks. It is ESSENTIAL that you apply wood treatment immediately after the building This will allow for 2 Turn Buttons (No.