Radyne XICOM 310-0415-002 Operation

Advertisement

Quick Links

Operation
Revision ECO
1
Preliminary Release
A
9869 Original Release
B
10033 Update to reflect amplifier improvement 08/05/2002 A.L. Crozier, Jr.
C
12707 Add German Translation
D
13557 Add 2nd Generation PS Information
MNC-0400-012
Record of Changes
Description
1 of 8
Date
Initiated By
04/02/2002 A.L. Crozier, Jr.
06/05/2002 A.L. Crozier, Jr.
12/03/2004 A.L. Crozier, Jr.
11/21/2005 S. Ludvik
Revision D
Operation

Advertisement

Table of Contents
loading

Summary of Contents for Radyne XICOM 310-0415-002

  • Page 1 Operation Operation Record of Changes Revision ECO Description Date Initiated By Preliminary Release 04/02/2002 A.L. Crozier, Jr. 9869 Original Release 06/05/2002 A.L. Crozier, Jr. 10033 Update to reflect amplifier improvement 08/05/2002 A.L. Crozier, Jr. 12707 Add German Translation 12/03/2004 A.L. Crozier, Jr. 13557 Add 2nd Generation PS Information 11/21/2005 S.
  • Page 2: Table Of Contents

    Operation Operation ............3 Description .
  • Page 3: Operation

    Operation Operation Description This chapter contains AC Power information for two power supplies: Generation 1 (Enable Switch). Part Number 310-0415-002 Outline Drawing 304-0215-004 Generation 2 (Circuit Breaker). Part Number 310-0415-004 Outline Drawing 304-0215-007 An external control and monitor unit may be used to operate the SSPA ODU series amplifiers.
  • Page 4: Power Supply Voltage Fault

    Operation Power Supply Voltage Fault The power supply voltage fault circuit will latch immediately when a fault in one of the three internal power supply voltages occurs. A voltage fault may be cleared by sending the Fault Reset command. SSPA Overtemperature Fault A SSPA over-temperature fault will clear itself once the temperature of the base plate is reduced to a safe operating level.
  • Page 5: Control And Status Signals

    Operation Control and Status Signals Control Signals AC Power ON Generation 1 Power Supply Normal (M&C Interface) The SSPA is turned on by connecting the AC Cord to the prime AC power source. ON/OFF control of the AC input is at the AC power source.
  • Page 6: Initial Turn On

    Operation Initial Turn On The Initial Turn On procedure has three parts: Prepower Check. • Turn On. • Turn Off. • This procedure should be followed to ensure proper operation of the amplifier and to avoid permanent damage to the amplifier. Caution Ensure that all of the following instructions are followed.
  • Page 7: Turn On

    Operation Vorsicht Überschreiten Sie nicht die in der Produktspezifikation angegebene Begrenzung der HF-Eingangsspannung. Sie verursachen sonst eine Überhitzung der SSPA. Nichtbeachtung kann zu einer bleibenden Schädigung der SSPA führen. Turn On 1 There are two ways to turn ON the SSPA: Normal (M&C) Interface) —...
  • Page 8 Operation it will turn ON and be in the same state as it was when you turned it off. Generation 2 Power Supply The SSPA is switched off by turning OFF the prime AC power using the circuit breaker . If you turn the system OFF it will turn ON and be in the same state as it was when you turned it off.

This manual is also suitable for:

Xicom 310-0415-004

Table of Contents