SystemAir Geniox Softcooler 12 Installation And Service

SystemAir Geniox Softcooler 12 Installation And Service

Complete cooling unit

Advertisement

Quick Links

Complete cooling unit for Geniox
Geniox Softcooler 12-24
GB
Installation and Service
Document in original language | 212930 · A001

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Geniox Softcooler 12 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SystemAir Geniox Softcooler 12

  • Page 1 Complete cooling unit for Geniox Geniox Softcooler 12-24 Installation and Service Document in original language | 212930 · A001...
  • Page 2 212930 | A001...
  • Page 3: Table Of Contents

    Contents Overview............................1 Type label ..........................1 Warranty ..........................1 Disposal and recycling ......................2 Important Safety Information ......................2 Intended Use ..........................2 Admonitions...........................2 Declaration of Conformity......................3 Technical Data ..........................4 Unit size and Compressor(s).......................4 Refrigerant..........................4 Delivery, Transport, Storage ........................4 Transport and storage ......................4 Delivery/Unloading ........................5 Prerequisites for Installation........................5 Location and Space Requirements ....................5 Positions and Placement ......................6...
  • Page 4 Contents 11.1.1 Batteries ......................... 10 11.1.2 Control panel and automatic controls ................11 11.2 Function principle ........................11 11.2.1 Other regulation ......................11 212930 | A001...
  • Page 5: Overview

    Further prerequisites are a completed maintenance plan with no gaps and a commissioning re- port. Systemair will require these in the case of a warranty claim. The commissioning report is a component of this document. The maintenance plan must be created by the operator, see section 8 Service and maintenance, page 8.
  • Page 6: Disposal And Recycling

    | Important Safety Information Disposal and recycling This product is compliant to the WEEE directive. When disposing the unit, follow your local rules and regulations. This product packing materials are recyclable and can be reused. Do not dispose in household waste.
  • Page 7: Declaration Of Conformity

    Systemair UAB Linų st. 101 LT–20174 Ukmergė, LITHUANIA Office: +370 340 60165 Fax: +370 340 60166 www.systemair.com hereby confirms that the following products: Geniox Softcooler 12 Geniox Softcooler 14 Geniox Softcooler 16 Geniox Softcooler 18 Geniox Softcooler 20 Geniox Softcooler 22...
  • Page 8: Technical Data

    | Technical Data Mats Sándor Technical Director Technical Data Unit size and Compressor(s) One frequency-controlled compressor is supplied in all unit sizes. 400V 230V Cooling Power Compressor Power Compres- Power Main Main Unit size capacity range frequency swich frequency swich converter converter VZH044CG...
  • Page 9: Delivery/Unloading

    Verify that all ordered equipment are delivered before starting the installation. Any discrepancies from the or- dered equipment must be reported to the supplier of Systemair products. Unpacking • Unpack the product carefully. • Check the air handling unit for obvious transport damage.
  • Page 10: Positions And Placement

    | Installation Positions and Placement Geniox Softcooler must always be placed on the warm side of the rotor. In other words, the cooling section has to be placed between the rotor box and supply air fan box. Geniox Softcooler is produced in four positions: supply air down, right and left, and supply air up, right and left.
  • Page 11: Electrical Connection

    The sections must then be locked permanently together with 8 mm bolts and nuts through the grey guiding and connection blocks. Systemair have provided you the 8 mm bolts with round heads and nuts required to carry this task out.
  • Page 12: Power Control

    The expansion valve is one of the most important components of the cooling system. This is adjusted at the factory and superheating is 5K. Warning If there are any leaks in the refrigerant circuit, Systemair must be contacted for further handling. 212930 | A001...
  • Page 13: Other Maintenance

    Frequency converters must not be touched configured. Converter settings are made at the factory, and it is important that the parameters are not changed without consultation with Systemair. This could have critical consequences for compressors and the warranty may be invalidated.
  • Page 14: Electrical Faults

    10.4 Faults in cooling technology Important Before carrying out any work on the cooling technology within the warranty period, Systemair must be contacted first, if necessary with any requests for covering costs. Only authorised cooling companies may carry out work on the cooling circuit. A manometer should be connected and the pressure checked.
  • Page 15 Description of Geniox Softcooler | Caution It is important that the supplied drain trap with ball is fitted before commissioning. 11.1.2 Control panel and automatic controls The automatic controls cabinet is supplied as an integrated part of the cooling box, with a door for inspection and serv- ice work.
  • Page 16 Systemair UAB Linų st. 101 LT–20174 Ukmergė, LITHUANIA Phone +370 340 60165 Fax +370 340 60166 www.systemair.com...

Table of Contents