Download Print this page

Sealey AP12160 Instructions page 3

Workbench 1.2 metre with drawer

Advertisement

5.1
study each diagram and identify the components required with
reference to the parts list/drawing on page 1.
5.2
Build up the basic frame as shown in diagrams 1,2,3 & 4.
5.3
Attach the drawer supports to the basic frame as shown in
diagram 5.
5.4
Assemble the drawer with reference to diagram 6. place the
6mm MDf drawer base into the bottom of the draw frame.
7
9
Parts support is available for this product. To obtain a parts listing and/or diagram, please log on to
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.
IMPORTANT: no liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
INFORMATION: for a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.
© Jack sealey Limited
www.sealey.co.uk, email sales@sealey.co.uk or phone 01284 757500.
Sole UK Distributor, Sealey Group,
Kempson Way, suffolk Business park,
Bury st. Edmunds, suffolk,
Ip32 7Ar
Original Language Version
Insert the drawer into the drawer runners as shown in diagrams
7 and 8.
5.5
place one 15mm MDf board onto the top of the frame as
shown in diagram 9 to form the worktop. Insert the other 15mm
MDf board into the lower part of the frame and move it into
position on the lower support beams to form the lower shelf.
see diagrams 9 & 10.
8
01284 757500
01284 703534
10
www.sealey.co.uk
Web
sales@sealey.co.uk
email
Ap12160 Issue no.1 21/06/12

Advertisement

loading