Sunsystem P Series Installation And Operation Manual

Sunsystem P Series Installation And Operation Manual

Buffer tanks up to 5000 l
Hide thumbs Also See for P Series:

Advertisement

BUFFER TANKS
series P/PS/PSM/PBM/SPBM
up to 5000 L
TECHNICAL PASPORT
INSTALLATION AND OPERATION MANUAL
EN
Version 0.7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the P Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sunsystem P Series

  • Page 1 BUFFER TANKS series P/PS/PSM/PBM/SPBM up to 5000 L TECHNICAL PASPORT INSTALLATION AND OPERATION MANUAL Version 0.7...
  • Page 2 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL...
  • Page 3: Table Of Contents

    INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL CONTENTS INSTRUCTION TO INSTALLER ................4 1.1. Requirements to water tank installation room............. 4 1.2. Requirements for installation................4 DESCRIPTION OF BUFFER TANK ................4 2.1. Insulation and outer casing................... 6 2.2. Connecting of safety relief valve to buffer tank............6 2.3. Thermometer......................6 2.4. Electric heating element ..................7 2.5. Thermostat......................10 TECHNICAL PARAMETERS BUFFERS - Р series ..........14 TECHNICAL PARAMETERS BUFFERS - РBM series ..........
  • Page 4: Instruction To Installer

    2. DESCRIPTION OF BUFFER TANK • safety during installation - personal protective equipment Accumulates the heat generated by boiler; recommended for each space-heating Use only original SUNSYSTEM parts. system. Ensures optimum operating mode of biomass boiler, permitting its...
  • Page 5 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL functioning at nominal power output even 20 mm and foamed polyethylene with when the heating system does not need RAL 9006 color. all the heat energy produced thereby. (only for models - 80 L and 100 L). - Multi-position mounting of Produced heat is accumulated and stored temperature sensor. inside the buffer tank and can be used - Heat exchanger coil /coils (PS 1 /PS 2). even when the boiler itself has cooled - All threads are internal.
  • Page 6: Insulation And Outer Casing

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL SPBM series - The quality of the insulation of a water heater is a key factor for its heat Inlet/Outlet arrangement: 90 angle conservation capability and energy degrees easy convenient efficiency. installation. All Buffer tanks have a high efficiency Possible installation in the corner of boiler insulation (DIN 4753, part 8) and outer room.
  • Page 7: Electric Heating Element

    INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 2.4. Electric heating element /option/ The connection of the electric heating element to the electric power supply must be done by a All buffer tanks are equipped with  qualified electricians. Outlet connection 1 ½“ for electric heating When connect heating element to the electric network, element: make sure that it is properly grounded.
  • Page 8 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL CONNECTIONS SCHEMES...
  • Page 9 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL...
  • Page 10: Thermostat

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 2.5. Thermostat /option/. schema 1 This is an adjustable double THERMOSTAT TECHNICAL CHARACTERISTICS which is designed to regulate the water Temperature range – regulation: temperature and ensures safety tolerance; 0°C÷90°C, limit: 90°C÷110°C it can be manually adjusted (TLSC model) Tolerance – regulation: ± 5k, limit - 15k; - or automatically adjusted (TLSC/A model). 6k (depends on the type) Temperature differential – regulation: 6 ± 2k; 4 ± 1k (depends on the type), limit 25 ± 8k; 15 ± 8k (depends on the type) Automatic adjustment (TLSC/A) and manual adjustment (TLSC).
  • Page 11 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL Terminal – circuit breaker or switch-on а) See Schema 3 and 4. contacts. Switch-on action – 2B. Place of installation – NORMAL. Type of wire – M20 x 1.5. schema 3 WARNING! installation operations, including manual  adjustments, must be fulfilled by a qualified specialist following all safety conditions. INSTALLATION AND CONNECTION Safety instructions: schema 4...
  • Page 12 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL TEMPERATURE ADJUSTMENT A – Reset button (only for TLSC) B – Knob for temperature adjustment schema 6 NOTE: See Figure 6. To close the front part, the cartridge opening must align with the coupling of the adjustment knob.
  • Page 13 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL...
  • Page 14: Technical Parameters Buffers - Р Series

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3. TECHNICAL PARAMETERS BUFFERS - Р series 3.1. Model Р - without coIl P 300 P 500 P 800 P 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm Ø 650/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95...
  • Page 15 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL P 1500 P 2000 P 2500 Р 3000 P 5000 Capacity 1500 2000 2500 3000 5000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 2940/2990 Minimal vertical clearance 2220 2220 2542 2332 3066 Diameter without insulation /with insulation D, mm Ø 1000/1200 Ø 1200/1400 Ø 1250/1450 Ø 1400/1600 Ø 1600/1800...
  • Page 16 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3.2. Model РR - with one coil PR 300 PR 500 PR 800 PR 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm Ø 650/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95...
  • Page 17 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL PR 1500 PR 2000 PR 2500 PR 3000 Capacity 1500 2000 2500 3000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 Minimal vertical clearance 2220 2220 2542 2332 Diameter without insulation /with insulation D, mm Ø 1000/1200 Ø 1200/1400 Ø 1250/1450 Ø 1400/1600 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95...
  • Page 18 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 3.3. Мodel РR2 - with two coils PR2 300 PR2 500 PR2 800 PR2 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1610/1660 1860/1910 2040/2090 Minimal vertical clearance 1430 1640 1900 2075 Diameter without insulation /with insulation D, mm Ø 650/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95...
  • Page 19 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL PR2 1500 PR2 2000 PR2 2500 PR2 3000 Capacity 1500 2000 2500 3000 Height without insulation / with insulation H, Hi, mm 2150/2220 2132/2182 2482/2532 2246/2296 Minimal vertical clearance 2220 2220 2542 2332 Diameter without insulation /with insulation D, mm Ø 1000/1200 Ø 1200/1400 Ø 1250/1450 Ø 1400/1600 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95...
  • Page 20: Technical Parameters Buffers - Рbm Series

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 4. TECHNICAL PARAMETERS BUFFERS - РBM series 4.1. Model РBM/PBM H* - without coil PBM/H* PBM/H* 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 Minimal vertical clearance 1430 1727 1877 2073 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 3/95 Recommended boiler size, connected to buffer tank 6-10 10-17 15-27...
  • Page 21 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL РBM 1500 2000 2500 3000 5000 Capacity 1500 2000 2500 3000 5000 Height without insulation / with insulation H, Hi, mm 2140/2290 2131/2181 2713/2763 2746/2796 2841/2891 Minimal vertical clearance 2192 2220 2760 2817 2932 Diameter without insulation /with insulation D, mm Ø 1000/1200 Ø 1200/1400 Ø 1250/1450 Ø 1400/1600 Ø 1600/1800 Operating pressure/Max. buffer temperature bar/ 3/95...
  • Page 22 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 4.2. Model РBM R - with one coil PBM R PBM R PBM R/H* PBM R/H* 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 Minimal vertical clearance 1430 1727 1877 2073 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95...
  • Page 23 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL PBM R PBM R PBM R РBM R PBM R 1500 2000 2500 3000 5000 Capacity 1500 2000 2500 3000 5000 Height without insulation / with insulation H, Hi, mm 2140/2290 2131/2181 2713/2763 2746/2796 2841/2891 Minimal vertical clearance 2192 2220 2760 2817 2932 Diameter without insulation /with insulation D, mm...
  • Page 24 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 4.3. Model РBM R2 - with two coils PBM R2 PBM R 2 PBM R2/H* PBM R2/H* 1000 Capacity 1000 Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 2039/2089 Minimal vertical clearance 1430 1727 1877 2073 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95...
  • Page 25 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL PBM R2 PBM R2 PBM R2 РBM R 2 PBM R 2 1500 2000 2500 3000 5000 Capacity 1500 2000 2500 3000 5000 Height without insulation / with insulation H, Hi, mm 2140/2290 2131/2181 2713/2763 2746/2796 2841/2891 Minimal vertical clearance 2192 2220 2760 2817 2932 Diameter without insulation /with insulation...
  • Page 26: Technical Parameters Buffers - Sрbm Series

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 5. TECHNICAL PARAMETERS BUFFERS - SРBM series 5.1. Model SРBM - without coil SPBM SPBM SPBM Capacity Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 Minimal vertical clearance 1430 1727 1877 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Recommended boiler size, connected to buffer tank 6-10 10-17 15-27 Weight without insulation/with insulation kg, kg i 60/70 81/93 108/125...
  • Page 27 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL SPBM SPBM SPBM 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation / with insulation H, Hi, mm 2039/2089 2140/2290 2131/2181 Minimal vertical clearance 2073 2192 2220 Diameter without insulation /with insulation D, mm Ø 790/990 Ø 1000/1200 Ø 1200/1400 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Recommended boiler size, connected to buffer tank 18-33 27-50 36-67 Weight without insulation/with insulation kg, kg i...
  • Page 28 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 5.2. Model SРBM R - with one coil SPBM R SPBM R SPBM R Capacity Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 Minimal vertical clearance 1430 1727 1877 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110 16/110 16/110 Recommended boiler size, connected to buffer tank...
  • Page 29 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL SPBM R SPBM R SPBM R 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation / with insulation H, Hi, mm 2039/2089 2140/2290 2131/2181 Minimal vertical clearance 2073 2192 2220 Diameter without insulation /with insulation D, mm Ø 790/990 Ø 1000/1200 Ø 1200/1400 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110...
  • Page 30 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 5.3. Мodel SРBM R2 - with two coils SPBM R2 SPBM R 2 SPBM R2 Capacity Height without insulation / with insulation H, Hi, mm 1410/1460 1700/1750 1838/1888 Minimal vertical clearance 1430 1727 1877 Diameter without insulation /with insulation D, mm Ø 550/750 Ø 650/850 Ø 790/990 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110 16/110 16/110...
  • Page 31 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL SPBM R2 SPBM R2 SPBM R2 1000 1500 2000 Capacity 1000 1500 2000 Height without insulation / with insulation H, Hi, mm 2039/2089 2140/2290 2131/2181 Minimal vertical clearance 2073 2192 2220 Diameter without insulation /with insulation D, mm Ø 790/990 Ø 1000/1200 Ø 1200/1400 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110...
  • Page 32: Technical Parameters Buffers - Рs Series

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 6. TECHNICAL PARAMETERS BUFFERS - РS series 6.1. Model PS - without coil /150L - 200 L/ Capacity Height H, mm 1310 1710 Minimal vertical clearance 1400 1780 Diameter without insulation /with insulation D, mm Ø 400/500 Ø 400/500 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 Recommended boiler size, connected to buffer tank 6-10 6-10 Weight kg, Sleeve for Electric heating element В, mm, Rp1 1/2”...
  • Page 33 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 6.2. Мodel PS 1 - with one coil PS 1 PS 1 Capacity Height H, mm 1310 1710 Minimal vertical clearance 1400 1780 Diameter without insulation /with insulation D, mm Ø 400/500 Ø 400/500 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110 16/110 Recommended boiler size, connected to buffer tank 6-10 6-10 Weight kg, Sleeve for Electric heating element В, mm, Rp1 1/2”...
  • Page 34 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 6.3. Мodel PS 2 - with two coils PS 2 PS 2 Capacity Height H, mm 1310 1710 Minimal vertical clearance 1400 1780 Diameter without insulation /with insulation D, mm Ø 400/500 Ø 400/500 Operating pressure/Max. buffer temperature bar/ 3/95 3/95 Operating pressure /Max. coil temperature bar/ 16/110 16/110 Recommended boiler size, connected to buffer tank 6-10 6-10 Weight kg, Sleeve for Electric heating element В, mm, Rp1 1/2” Heat carrier С1, mm, Rp1 1/2”...
  • Page 35: Technical Parameters Buffers - Рsm Series

    INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 7. Мodel PSM - without coil /30 L - 100 L/ PSM 80-100 (Rp1 ”) PSM 30 PSM 50 (Rp1 ”) (Rp1 ”) Capacity Height without feet H, mm Diameter with insulation D, mm Ø 440 Ø 440 Ø 440 Ø 440 Operating pressure/Max. buffer temperature bar/ 6/95 6/95 6/95 6/95 Recommended boiler size, connected to buffer tank 6-10 6-10...
  • Page 36: Schemes

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 8. SHEMES...
  • Page 37 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL...
  • Page 38 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL...
  • Page 39: Transport And Packing

    INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL 9. TRANSPORT AND PACKING Easy and quick packing of the water heater with soft insulation. All necessary The buffers can be with or without insu- openings in the soft polyurethane casing lation. are made beforehand, and the installer They are secured on a pallet. Packed with has only to find them and take them out. foil. The casing is fastened by a zipper at the All models up to 2500 liters are secured assembly platform.
  • Page 40 INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL vided for in the general conditions of sale. d) Damages in the appearance of prod- b) This warranty certificate is considered ucts shall not be considered as defects void in cases when defects and errors in except for those ones which cause loss- functioning es during operation or change technical of products are caused by:...
  • Page 41 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL when there is reason for urgency, the cus- country concerning product liability. tomer demands immediate replacement Abovementioned warranty limi- of the product he has claimed warranty tations will be applied in any cases, and for, before the decision as to the claim when they do not violate the regulations has been made, said request shall be in any country concerning product liabil-...
  • Page 42: Recycling And Waste Disposal

    INSTALLATION and OPERATION MANUALINSTALLATION and OPERATION MANUAL 11. RECYCLING AND WASTE DISPOSAL At the end of life cycle of each product its components are due to be disposed of in conformity with regulatory prescriptions. Obsolete equipment shall be collected separately from other recyclable waste containing materials with adverse effect on health and environment. Metal details, as well as non-metal ones shall be sold to licensed recyclable metal or non-metal waste collection organiza- tions. Those should not be treated as do- mestic waste.
  • Page 43 INSTALLATION and OPERATION MANUAL INSTALLATION and OPERATION MANUAL...
  • Page 44 ISO 9001 BUREAU VERITAS Certification tel.: +359 700 17 343 www.burnit.bg...

Table of Contents