Download Print this page

SSC 2150 Assembly & Operation

Commercial broadcast spreader

Advertisement

Quick Links

COMMERCIAL BROADCAST SPREADER
2150
Model:
P52110_MXXXXX_Jan2020
SSC ASSEMBLY & OPERATION
HELPFUL HINTS
+ If your spreader does not spread
evenly, be sure "FRONT" on the GEAR-
BOX points to the front of the spread-
er. The impeller must turn clockwise
when pushing forward. Reversing
the GEARBOX will cause the impeller
to turn counter clockwise. Clean the
impeller plate after each use. Fertilizer
stuck on the impeller blades will cause
uneven spreading.
+ Your spreader is designed to be
pushed at three miles per hour, which
is a brisk walking speed. Clean and
dry your spreader thoroughly after
each use. Coat all metal surfaces
(pay special attention to the inside &
outside of tubing - it's easiest to do
while assembling) with light oil, Fluid
Film
or silicon spray to help prevent
®
corrosion. Wash between the shut off
plate and the bottom of the hopper.
Do not use powdered materials.
+ Gears are permanently lubricated at
the factory. Do not open the gearbox
or dirt may enter.
ROCK SALT &
POWDERED MATERIALS
SHOULD NOT BE USED
in this spreader as it will damage
gearbox and can void warranty.
GRANULAR MATERIALS
USE ONLY
PAGE 1
PAGE 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 2150 and is the answer not in the manual?

Questions and answers

Summary of Contents for SSC 2150

  • Page 1 COMMERCIAL BROADCAST SPREADER 2150 SSC ASSEMBLY & OPERATION Model: HELPFUL HINTS + If your spreader does not spread evenly, be sure “FRONT” on the GEAR- BOX points to the front of the spread- er. The impeller must turn clockwise when pushing forward. Reversing the GEARBOX will cause the impeller to turn counter clockwise.
  • Page 2: Gearbox Assembly

    ASSEMBLY BOLT IDENTIFIER Remove and identify all loose parts from carton. 32100 32103 Qty 2 Qty 8 33117 1” Qty 1 1-1/2” 33108 Qty 1 12152 2” 31104 Qty 2 31100 33109 Qty 4 Qty 4 2-1/4” 31120 Qty 1 Qty 4 31106 12148...
  • Page 3 ASSEMBLY Install gearbox by inserting the pinion shaft into hole in center of hoppers bottom. The word “FRONT” on the gearbox must point to Front of the hopper. Gearbox The EarthWay logo is on the front of the hopper. FRONT A - Install LOWER HANDLES onto FRAME to both sides as shown.
  • Page 4 ASSEMBLY Bearing Slide AXLE into the LOWER HANDLE, then the GEAR- Bushing BOX and into the other LOWER HANDLE as shown at Install the axle right. Next, install AXLE BEARINGS over the AXLE and Bearing as shown above into both LOWER HANDLES as shown at right. NOTE: Tab on BEARINGS and notches in the LOWER HAN- DLES you need to align.
  • Page 5 ASSEMBLY Insert Pivot Rod Insert pivot rod into shut-off plate as shown below. into Shut-Off TURN TO LOCK IN PLACE. and rotate to secure Pivot Shut-Off Rotate Plate Pivot Angle Pivot Rod with extra bend Attaching Insert other end of pivot rod into pivot and bracket assembly TURN TO LOCK IN PLACE.
  • Page 6 CALIBRATION Pull lever back to setting “30” on gauge and lever assembly. Next push pivot & bracket forward so that the shut off plate in the hopper is in the full open position. REMEMBER SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY CALIBRATED.
  • Page 7 #14 X 1 1/2 TYPE 25 FHPS ZINC 44249 FRAME BRACE (2150/2170) 32103 1/4-20 NYLON INS LOCKNUT ZINC 25228 CROSS BRACE (2150/2170/S25) 11.25 REV908 11927 SHUTOFF SUPPORT- LARGE 31106 1/4-20 X 2 1/4” HHCS ZINC 31120 1/4-20 X 2” HHCS ZINC 12110 IMPELLER 9”...
  • Page 8 PAGE 8...
  • Page 9 STEP 2: Find the closest LBS/1,000 square feet in Broadcast Setting Matrix below, based on the material particle size. (Example: 2.0 LBS/1,000 square feet = Spreader Setting of 9,11, or 13 based on particle size) BROADCAST SPREADER SETTING MATRIX for 2150/2170 models with dished impellers GRANULAR MATERIAL Fine/Small ...
  • Page 10: Customer Service

    OPERATING INSTRUCTIONS Before filling hopper, become familiar with the operation of this spreader. 1. Obtain proper setting for material to be used 4. To stop, push lever forward to close flow holes from the enclosed SETTING MATRIX included before you stop moving. with this spreader, or from our web site under 5.