Siemens Wallace & Tiernan Chem-Ad VPP Instruction Manual page 77

Peristaltic metering pumps
Table of Contents

Advertisement

Available languages

Available languages

Chem-Ad
VPP / VPP-E / VPP-DC
®
Removing the pump hose
Capacity kit
Installing the pump hose
6.2.1
Replacing the pump hose
If you only need to replace the pump hose, proceed as follows:
1 Remove capacity kit (see chapter 6.2, steps 1 through 4).
2 Pinch off and remove the hose clip.
3 Pull the pump hose from the hose clamp (risk of splashing!)
A Pump hose
B Hose identification
C Hose clip (not included with pump hose 150 PH)
D Hose clamp
1 Clean and dry the hose clamp.
2 Put the new pump hose in until it hits the hose nipple, without
twisting it in the process. The colored hose identification must
be visible from the front.
3 Secure the pump hose on both sides with overleaf closing
hose clips (not for capacity kit 150 PH).
4 Install capacity kit (see chapter 6.2, steps 5 through 9).
6.
Maintenance
A
B
C
D
77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents