Pre-Installation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Downtown Spa and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Aquatica Digital Downtown Spa

  • Page 1 Downtown Spa Pre-Installation Manual...
  • Page 2: Pre-Installation

    PRE-INSTALLATION 1: D D D O O O W W W N N N T T T O O O W W W N N N TECHNICAL SPECIFICATIONS Maximum water content Maximum water content 137 Gallons 1631 lbs Weight with water Weight with water Freestanding Emergency Drain...
  • Page 3 Downtown Spa The spa works efficiently and safely if it is installed 80˚C correctly and in compliance with the regulations in 176˚F country of use. This pre-installation guide provides information for a proper preparation of the environments and the plumbing and electrical connections.
  • Page 4 PRE-INSTALLATION 2: WHAT PREPARATIONS ARE REQUIRED? To be installed, the hot tub requires: Identification of the installation site. Preparation of the installation site. Preparation of the plumbing. Preparation of the electrical system. The water feed is only applicable to hot tubs ordered with electronic fill function.
  • Page 5: Outdoor Installation

    Downtown Spa 3: IDENTIFICATION OF THE INSTALLATION SITE When choosing the position, take into account the l l l o o o c c c a a a l l l e e e l l l e e e c c c t t t r r r i i i c c c a a a l l l s s s t t t a a a n n n d d d a a a r r r d d d s s s that prohibit any electrical installation (plug sockets, switches, lamps, etc.) in the area surrounding the...
  • Page 6 PRE-INSTALLATION 4: PREPARATION OF THE INSTALLATION SITE RECESSED INSTALLATIONS Prepare: As a base, create a reinforced concrete recess having a A technical inspection port at least 20” wide on all sides thickness of at least 4”, perfectly flat and able to support of the minipool.
  • Page 7: Built-In Installations

    Downtown Spa 4: PREPARATION OF THE INSTALLATION SITE CONTINUED BUILT-IN INSTALLATIONS Inspection compartment details Perimetric inspection compartment of 20” with removable floor Internal drainage grates. Non-slip flooring is recommended. Controls / Installations side Two Ø6“ vents to ensure proper ventilation of the technical compartment.
  • Page 8 Downtown Spa DOWNTOWN SPA FREESTANDING (Built-in) Base cutout for drainage, electrical feed and water supply (if applicable).
  • Page 9: Electrical Preparations

    PRE-INSTALLATION 6: ELECTRICAL PREPARATIONS Downtown Spa by Aquatica Bond in accordance with national and local codes. Open bonding lugs are located at the top of the junction box. 120/240 VAC Source Breaker Box * Connections to be made Typical T wo-Pole Circuit...