Download Print this page

Sealey AP12160 Quick Start Manual page 4

1.2m workbench with drawer

Advertisement

5.1
Study each diagram and identify the components required with
reference to the parts list/drawing on page 1.
5.2
Build up the basic frame as shown in diagrams 1,2,3 & 4.
5.3
Attach the drawer supports to the basic frame as shown in
diagram 5.
5.4
Assemble the drawer with reference to diagram 6. Place the
6mm MDF drawer base into the bottom of the drawer frame.
Insert the drawer into the drawer runners as shown in diagrams
7 and 8.
5.5
Place the 15mm MDF board onto the top of the frame as
shown in diagram 9 to form the worktop. Insert the other 6mm
MDF board into the lower part of the frame and move it into
position on the lower support beams to form the lower shelf.
See diagrams 9 & 10.
Parts support is available for this product. Please email sales@sealey.co.uk or telephone 01284 757500
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
01284 703534
sales@sealey.co.uk
Original Language Version
www.sealey.co.uk
AP12160
Issue 2 (H,F)
11/08/20
10

Advertisement

loading