To access the Zellabox PDU using a smart device Option 2 - To access the Zellabox PDU using LAN connections Option 3 - To access the Zellabox PDU through a network / switch or something similar 7 Pyrorack 7.1 Preparation Step 1 7.2 Preparation Step 2...
The Micro Data Centre is available in two models namely; Cubb ® Cubb Duo. The Cubb is a single cooling unit and the CubbDuo is a dual cooling unit. This guide needs to be followed according to the steps of installation...
Zellabox Safety Instructions 2 Safety Instructions 2.1 Overview Important safety note • Caution needs to be taken when removing the side panels of the Micro Data Centre, in particular when dealing with the 38U as This manual contains instructions relating to safety, installation, they are heavy.
Important note Following the connection to mains power DEPENDING ON SIZE AND MODEL. Power DEPENDING ON MODEL (CUBB & CUBBDUO) THE SWITCHBOARD consumption can vary from less than 10 amps LAYOUT AND CONFIGURATION IS DIFFERENT. (SEE LAYOUT and up to 60 amps depending on load. When DIAGRAMS –...
Page 6
Zellabox Safety Instructions 3 Power connection 3.3 Power Supply diagram to PDU switchboard – 12U Cubb only Non-monitored sockets UPS Power Cooling system Cooling system Mains power...
Page 7
Zellabox Safety Instructions 3 Power connection 3.4 Switchboard layout – 25U,30U & 38U models Front View Rear View...
FOR FURTHER INSTRUCTION TO PROGRAM DOOR CODES. SEE USER MANUAL 4.2 Biometric / Card Reader The Zellabox is supplied with a default card which will open the front door. The rear door is opened by the push button located inside Card reader the Zellabox.
Do not try plug cooling system plug into switchboard until cooling system has been The Zellabox is supplied with all the cables (orange and grey) commissioned by qualified air con contractor which is pre-coiled and ready to be run with the copper piping during the commissioning process.
Page 10
5 Single & Dual cooling system commissioning steps: 5.3 Wiring cont. Electrical Hazard – Ensure cooling system is in the OFF position on Zellabox base mounted switchboard and orange cooling system plug is unplugged from rear of switchboard Grey cable termination in condenser...
Page 11
Zellabox Safety Instructions 5 Single & Dual cooling system commissioning steps: 5.3 Wiring cont. PLEASE NOTE: WHEN PLUGGING THE CABLE CONNECTORS, YOU SHOULD HEAR A CLICK TO CONFIRM CONTACT. AFTER INSERTING THE PLUG ENSURE BOTH ORANGE AND GREY CABLES ARE LOCKED BY TURNING THE YELLOW . DISK ON THE SIDE OF THE CABLE CONNECTOR WITH A SCREW DRIVER...
3) Never use piping which has been used for previous installation 5.4 Copper Piping (see hand out in Zellabox) 4) Do never install a refrigerant drier to this unit. s 3 or 4 turns by hand. Then tighten them fully with the torque wrenches.
Page 13
Name of Parts 5 Single & Dual cooling system commissioning steps: Remote Controller 5.5 Start up Procedure – Single Cooling ( Cubb) 1. ONLY once the condenser has been hardwired and copper piping Signal transmitter connected can the cooling system be turned on.
Page 14
Default IP address is 192.168.0.192 Zellabox PDU Configuration Guide OPTION 1: To access the Zellabox PDU using an smart device (iPhone, iPod, iPad, andriod devise etc.) follow these steps: 1. Download the following App (Raritan PDView) from the Apple App Store, 2.
Accept the terms of use check box. OPTION 3: To access the Zellabox PDU through a network / switch or something similar follow these steps: Assign the desired IP address to the PDU by referring to ‘OPTION 1’ above,...
Page 16
Safety Instructions 6 PDView Access: OPTION 4: To access the Zellabox PDU through a network / switch or something similar using DHCP follow these steps: Assign the desired IP address to the PDU by referring to ‘OPTION 1’ above,...
Page 17
For effective and safe installation follow the steps below Please note: Accidental discharge will occur if this guide is not followed step by step Please print, laminate & stick near your Zellabox for all to see the next 2 slides.
Page 18
7.5 Please print, laminate & stick the next 2 inserting the plug and tightening the washer slides near your Zellabox for all to see. 5. Reinsert the canister back into the Pyroack 6. Place the Pyrorack into position top of the Zellabox...
Page 19
Warning Fire Suppression System Information Before working within the Zellabox ALWAYS ensure you follow these steps: 1. Turn key switch to manual 2. Isolate both zones 1 and 2 by pressing the isolate zones buttons located on the front panel 3. ...
Page 20
Warning Fire Suppression System Information...
12. Replace with new canister. 13. Follow commissioning steps. 7.7 Important tips. Before working within the Zellabox ALWAYS ensure you follow these steps: 1. Turn key switch to manual 2. Isolate both zones 1 and 2 by pressing the isolate zones buttons located on the front panel 3. ...
Zellabox Start-up procedure 8 Start-up and ready for population The Zellabox Micro Data Centre is a PLUG N 2. Follow Pyrorack Commissioning steps NOTE: DO NOT exceed the cooling system’s PLAY unit therefore once it has been installed from the installation manual.
Page 23
Zellabox Zellabox™ Pty Ltd PO Box 1035 Osborne Park DC Western Australia 6916 AUSTRALIA 1300 117 644 www.zellabox.com info@zellabox.com Version 2014-011...