DuraMAC 5030CVSPBUSS Installation & Operation Manual

DuraMAC 5030CVSPBUSS Installation & Operation Manual

Pre-assembled primary & battery back-up sump pump system

Advertisement

INSTALLATION &
OPERATION MANUAL
PRE-ASSEMBLED PRIMARY &
BATTERY BACK-UP
SUMP PUMP SYSTEM
5030CVSPBUSS, 5033CVSPBUSS
www.aymcdonald.com
A.Y. McDonald BBU Manual Revised 8-13
3210-479 Rev. A
12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 5030CVSPBUSS and is the answer not in the manual?

Questions and answers

Summary of Contents for DuraMAC 5030CVSPBUSS

  • Page 1 INSTALLATION & OPERATION MANUAL PRE-ASSEMBLED PRIMARY & BATTERY BACK-UP SUMP PUMP SYSTEM 5030CVSPBUSS, 5033CVSPBUSS www.aymcdonald.com A.Y. McDonald BBU Manual Revised 8-13 3210-479 Rev. A...
  • Page 2 This pump has been manufactured with your needs in mind. Properly installed in the right Notes: application, your new A.Y. McDonald pump will give you years of carefree performance. Important Safety Information: Carefully read and understand all of the Warnings and installation instructions in this manual.
  • Page 3 Notes: Always use a grounded outlet to attach the plug. A three-prong mating type receptacle is needed for safe use. This should be in accordance with the National Electric Code and any additional codes or laws required by your local government. It is strongly recommended to use a ground fault interrupt device on any electrical appliance, including this pump, when used in a wet or moist environment.
  • Page 4: Battery Selection

    BATTERY SELECTION PARTS LIST This system is designed to work with 12 volt, lead-acid deep cycle marine / RV batteries. 5000 5030, 5033 Either a flooded cell (serviceable or maintenance free) or sealed AGM battery are acceptable. Choose a battery with a minimum 90 amp-hour rating and a 175 minute reserve capacity or larger.
  • Page 5: Wiring & Electrical Connections

    NOTICE: Height and/or piping restriction will reduce the pump output performance. See WIRING & ELECTRICAL CONNECTIONS the performance chart below to insure you have the proper pump for your application. Whenever possible use the same size or larger pipe as the pump discharge for optimum performance.
  • Page 6: Testing Your Installation

    TESTING YOUR INSTALLATION 120 VOLT AC PRIMARY PUMP Once your installation and wiring connections are complete, unplug or TROUBLESHOOTING disconnect the power to the primary pump. PROBLEM POSSIBLE CAUSES HOW TO CORRECT Fill the basin using buckets or a hose. Observe the float switches to make sure they are positioned properly when the basin is filling.