I
Before You Start...
1. Read this manual carefully and completely.
2. ARDA range hoods conform to ETL/CSA standards.
3. The appliance has been manufactured as class I, there-
provided. The range hood must be installed so that that
the plug is easily accessible.
4. This appliance has been designed for use in both ducted
Planning Your Installation
Ceiling joists &
cross-bracings
Floor to
ceiling
pg 6
Ceiling duct opening
Center of
cooking
surface to
ceiling
visit us @ www.ardaappliances.com
-
1.
This hood can be installed on walls
between 8" and 9" tall.
2.
cooktop. Drop a plumb line from
your ceiling to this point on your
cooking surface.
3. Around this point, install cross brac-
ing between the ceiling joists for
the island hood to mount to.
4. Check your range/cook-top User
Manual
and maximum distance above your
cooking suface. The minimum
distance between any element or
bustable surface is 61cm (24").
5. Decided where the ductwork will
run between the hood and the out-
side. Short, straight duct runs will
-