GSi PNEG-1724 S2 Installation Manual

Canister

Advertisement

Quick Links

S2 Quick Start Guide Canister
Installation Manual
PNEG-1724
Version: 2.1
Date: 12-21-20
PNEG-1724

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PNEG-1724 S2 and is the answer not in the manual?

Questions and answers

Summary of Contents for GSi PNEG-1724 S2

  • Page 1 S2 Quick Start Guide Canister Installation Manual PNEG-1724 Version: 2.1 Date: 12-21-20 PNEG-1724...
  • Page 2 Personnel operating or working around this equipment should read this manual. This manual must be delivered with equipment to its owner. Failure to read this manual and its safety instructions is a misuse of the equipment. Any misuse of the equipment may void the warranty. PNEG-1724 S2 Quick Start Guide Canister...
  • Page 3: Table Of Contents

    Cautionary Symbols Definitions ......................5 Safety Cautions ............................. 6 Safety Sign-Off Sheet ........................... 9 Chapter 2 General Information ...........................10 Chapter 3 Installation ............................11 Chapter 4 Parts List .............................15 Components ............................15 Chapter 5 Warranty ..............................17 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 4: Chapter 1 Safety

    Personnel operating or working around equipment must read this manual. This manual must be delivered with equipment to its owner. Failure to read this manual and its safety instructions is a misuse of the equipment. ST-0001-3 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 5: Cautionary Symbols Definitions

    This symbol is used to address practices not related to NOTICE personal injury. This symbol indicates a general hazard. This symbol indicates a prohibited activity. This symbol indicates a mandatory action. ST-0005-2 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 6: Safety Cautions

    If you do not understand any part of this manual or need assistance, contact your dealer. ST-0002-1 Lifting Hazard • Single person lift can cause injury. • Use a mechanical lifting device to lift or move the equipment during installation. ST-0021-2 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 7 Lock-out power before resetting motor overloads. • Do not repetitively stop and start the drive in order to free a plugged condition. Jogging the drive in this manner can damage the equipment and drive components. ST-0009-2 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 8 Be aware of pinch points, which can trap or catch objects and cause injury. • Be sure all equipment is locked in position before operating. • Always lock out all power sources to the equipment when unloading is finished. ST-0051-1 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 9: Safety Sign-Off Sheet

    Below is a sign-off sheet that can be used to verify that all personnel have read and understood the safety instructions. This sign-off sheet is provided for your convenience and personal record keeping. Date Employee Name Supervisor Name ST-0007 PNEG-1724 S2 Quick Start Guide Canister...
  • Page 10: Chapter 2 General Information

    NEVER enter a grain bin unless ALL power driven equipment has been shut down. Disconnect and lock out power before entering the bin or servicing the equipment. ALWAYS keep ALL guards and shields in place, until all the power is disconnected and locked out. PNEG-1724 S2 Quick Start Guide Canister...
  • Page 11: Chapter 3 Installation

    3. Find a suitable position to mount the canister. GSI recommends that the canister be installed close to the Series II Sweep Operational Control Panel and the bin entry door. The height chosen should allow the canister to be easily recognized and utilized.
  • Page 12 (2) brackets and fasten together with three (3) 5/16"-18 nylock nuts (D). (See Figure 3B.) Figure 3B Ref # Description 5/16"-18 x 1-1/4" Bin Bolts with Washers 5/16"-18 Nylock Nuts PNEG-1724 S2 Quick Start Guide Canister...
  • Page 13 8. Attach the canister to the canister bracket with three (3) 5/16"-18 x 1-1/4" bolts (C) and nylock nuts (D). (See Figure 3C.) Figure 3C Ref # Description 5/16"-18 x 1-1/4" Bin Bolts with Washers 5/16"-18 Nylock Nuts PNEG-1724 S2 Quick Start Guide Canister...
  • Page 14 Make sure that the rubber gasket (F) is inserted between the canister body and the canister cap (E). The other guide should be placed in the work area for reference. (See Figure 3D.) Figure 3D Ref # Description Canister Cap Canister Gasket Quick Start Guide for the Shop PNEG-1724 S2 Quick Start Guide Canister...
  • Page 15: Chapter 4 Parts List

    5/16"-18 x 1-1/4" HH Bin Bolt w/ Washer YDP Grade 5 S-7382 5/16"-18 Nylock Nut Zinc Grade 5 PNEG-1723 Series II Sweep Quick Start Guide Pre-June 2010 PNEG-1759 Series II Sweep Quick Start Guide Post-May 2010 PNEG-1724 Quick Start Guide Installation Manual PNEG-1724 S2 Quick Start Guide Canister...
  • Page 16 NOTES PNEG-1724 S2 Quick Start Guide Canister...
  • Page 17: Chapter 5 Warranty

    12 months from the date of shipment (or, if shipped by vessel, 14 months from the date of arrival at the port of discharge). If, in GSI’s sole judgment, a product is found to have a defect in materials and/or workmanship, GSI will, at its own option and expense, repair or replace the product or refund the purchase price.
  • Page 18 Authorities having jurisdiction should be consulted before installations are made. 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 1-217-226-4421 Fax: 1-217-226-4420 www.gsiag.com GSI is a worldwide brand of AGCO Corporation. Copyright © 2016 by The GSI Group, LLC Printed in the USA CN-317126...

Table of Contents