Download Print this page

Sealey AK7160 Instructions page 2

Bearing puller set 10pc

Advertisement

5. OPERATION
5.1.
Before using the required attachment disassemble and grease as shown in fig.1. Collet to be fully inserted into the bearing before
attempting to pull the bearing.
5.2.
Insert the attachment into the bearing.
5.3.
Hold the attachment with a spanner and wind the drive pin into the attachment, with another spanner, until the jaws open and grip
the bearing, fig.2.
5.4.
Place the bridge extractor legs in the correct position over the bearing housing, tighten the cap head screws screws on the legs to
hold them in position, fig.3.
5.5.
Screw the bridge extractor's hex screw into the attachment. Hold the attachment with a spanner and tighten.
5.6.
Hold the long cap head screw still and wind the bearing out using the nut beneath, fig.3.
fig.3
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
fig.1
01284 703534
sales@sealey.co.uk
Original Language Version
fig.2
www.sealey.co.uk
AK7160 | Issue 1 09/01/20

Advertisement

loading

This manual is also suitable for:

5054511804744