Installation Dimensions And Descriptions; Installation - Igema EWLS Installation And Operating Instruction

Electronic water level switch
Table of Contents

Advertisement

5.1.1 Installation dimensions and descriptions

Process connection: on the side
A:
Boiler / Vessel connection dimensions
E:
Visible length / switching range
D:
Minimum water level
t:
Probe distance

5.1.2 Installation

The water column with probes is supplied fully pre-wired.
It is attached via the process connections in accordance with the rules / regulations on the
boiler.
Because of the temperature-dependent density of the medium, it must be
ensured that a flow through the add-on housing with the medium is
ensured, e.g. through a forced circulation (inclination).
Caution
Process connection: on the top/bottom
15

Advertisement

Table of Contents
loading

Related Products for Igema EWLS

Table of Contents