Download Print this page

Advertisement

Quick Links

b u i l d b o o k
Sbach 342
wingspan: 2,9 m
length: 2,7 m
engine: 100–170 cc
RTF weight: 15–16 kg
w w w. b a d a n . c z

Advertisement

loading
Need help?

Need help?

Do you have a question about the Thunderbolt Engine Sbach 342 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Lycoming Thunderbolt Engine Sbach 342

  • Page 1 b u i l d b o o k Sbach 342 wingspan: 2,9 m • length: 2,7 m • engine: 100–170 cc • RTF weight: 15–16 kg w w w. b a d a n . c z...
  • Page 2 Thank you for buying this kit and wish you a pleasant building. w w w. b a d a n . c z...
  • Page 3 Fuselage 1. Prepare and clean parts of motor lodge 2. Using Epoxy glue the motor lodge parts 3. Add the reinforcements on both sides - hard plywo- 4. Bottom plate and next bulkheads inserted 5. The rear bulkhead glued and motor lodge top - 6.
  • Page 4 Fuselage 7. Complete the top, bottom and sides of fuselage 8. Glue the GFK hinges for holding rudder to the bot- base tom of the tail parts 9. Fit bottom base to the motor lodge 10. Add gradually next bulkheads and fit them to the bottom base 11.
  • Page 5 Fuselage 13. All the rear bulkheads glued and attaches the 14. All the rear bulkheads glued and attaches the rudder ribs rudder ribs 15. Spruce strips 5x5 mm add to the bottom 16. Spruce strips 3x3 mm fit to the ridge 17.
  • Page 6 Fuselage 19. Cover also the rudder with balsa 20. The bulkheads of upper frame of canopy - cove- ring with balsa 2mm 21. The bulkheads of upper frame of canopy - covering 22. See the partition of balsa cover with balsa 2mm 23.
  • Page 7 Rudder 25. Put the ribs of rudder together and glue 26. Join rudder to fuselage with 4 mm brass tube 27. Balsa cover on the rudder top 28. For easy making of arc - water the light balsa 2mm 29. Glue one edge (CA) and then the rest (dispersion 30.
  • Page 8 Elevator 31. Put the ribs of elevator together 32. Using Epoxy glue the GFK hinges inside 33. Fit all next ribs 34. Balsa 2 mm covering 35. Cut the hole for servo on the bottom 36. Finished elevator Sbach 342 •...
  • Page 9 Wing 37. Put the ribs of wing together 38. Complete wing frame 39. Make an arc on the wing end 40. Leading part of the wing covered with balsa 2 mm 41. Covering on both sides 42. Film cover and GFK hinges glued inside Sbach 342 •...
  • Page 10 Wing 43. Balsa overlap 9 mm on the root and 6 mm 44. Prepare and wet balsa cover of on the end rib 451. Glue one edge (CA) and then the rest (dispersion 46. Glue one edge (CA) and then the rest (dispersion adhesive) adhesive) 47.
  • Page 11 Wing 49. Complete wing and aileron 50. Complete wing and aileron 51. Prepare the holes for GFK horns to the aileron 52. Trying to complete with wings 53. Covering film on the wing top 54. Prepare and place the labels Sbach 342 •...
  • Page 12 Cockpit 55. The instrument panels printed on paper and laminated Sbach 342 • wingspan: 2,9 m • length: 2,7 m • engine: 100–170 cc • RTF weight: 15–16 kg w w w. b a d a n . c z...
  • Page 13: Covering And Finishing

    Covering and finishing 56. Cover the whole fuselage with covering film and stick the labels Sbach 342 • wingspan: 2,9 m • length: 2,7 m • engine: 100–170 cc • RTF weight: 15–16 kg w w w. b a d a n . c z...
  • Page 14 Covering and finishing 57. Scale colored propeller Sbach 342 • wingspan: 2,9 m • length: 2,7 m • engine: 100–170 cc • RTF weight: 15–16 kg w w w. b a d a n . c z...
  • Page 15 See the offer of our other models ... w w w. b a d a n . c z...
  • Page 16 w w w. b a d a n . c z...