Quick Links

Scope of Work/Materials
PART 1
GENERAL
1.1
SECTION INCLUDES
Expandable emergency evacuation fire alarm system. – OWNER PROVIDED GAMEWELL E3
A.
SERIES FIRE ALARM SYSTEM EQUIPMENT
B.
Furnish all labor, materials, tools, equipment and services necessary for and reasonably
incidental to complete the fire alarm installation work as specified.
C.
For the purpose of this contract, the terms Owner, District, Architect, and Engineer shall mean
Madera Unified School District.
1.2
RELATED SECTIONS
A.
Related documents: general provisions of contract, including General and Supplementary
Conditions apply to work of this section.
1.3
REFERENCES
A.
Electrical Industries Association (EIA):
RS-232-D – Interface Between Data Terminal Equipment and Data Circuit-Terminating
1.
Equipment Employing Serial Binary Data Interchange
RS-485 – standard defining the electrical characteristics of drivers and receivers for use in
2.
balanced digital multipoint systems
B.
National Fire Protection Association (NFPA):
NFPA 12 – Standard on Carbon Dioxide Extinguishing Systems.
1.
NFPA 13 – Installation of Sprinkler Systems.
2.
NFPA 15 – Standard for Water Spray Fixed Systems for Fire Protection.
3.
NFPA 16 – Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray
4.
Systems.
NFPA 16A – Standard for the Installation of Closed Head Foam-Water Sprinkler Systems.
5.
NFPA 70 – National Electrical Code (NEC).
6.
NFPA 72 – National Fire Alarm Code.
7.
NFPA 90A – Standard for the Installation of Air Conditioning and Ventilating Systems.
8.
NFPA 101 – Life Safety Code.
9.
NFPA 750 – Standard on Water Mist Fire Protection Systems.
10.
NFPA 5000 – Building Construction and Safety Code.
11.
C.
Underwriters Laboratories (UL):
UL 268 – Standard for Smoke Detectors for Fire Alarm Signaling Systems.
1.
2.
UL 8649
a.
UOJZ, Control Units, System.
b.
SYZV Control Units, Releasing Device.
c.
UOXX, Control Unit Accessories, System.
13850 (28 31 00) - 1
Bid No.041818-Installation of New Fire Alarm System at Adams Elementary School
SECTION 13850 (28 31 00)
NETWORKED FIRE ALARM SYSTEM
– Standard for Control Units and Accessories for Fire Alarm Systems.
th

Advertisement

loading

Summary of Contents for Gamewell E3 Series

  • Page 1 Scope of Work/Materials SECTION 13850 (28 31 00) NETWORKED FIRE ALARM SYSTEM PART 1 GENERAL SECTION INCLUDES Expandable emergency evacuation fire alarm system. – OWNER PROVIDED GAMEWELL E3 SERIES FIRE ALARM SYSTEM EQUIPMENT Furnish all labor, materials, tools, equipment and services necessary for and reasonably incidental to complete the fire alarm installation work as specified.
  • Page 2: System Description

    Scope of Work/Materials UL 1971 – Standard for Signaling Devices for the Hearing Impaired. SYSTEM DESCRIPTION A new intelligent reporting, Style 7 networked, fully peer-to-peer, microprocessor-controlled fire detection and notification system shall be installed in accordance with the specifications and as indicated on the Drawings.
  • Page 3 Fire Alarm System: Incorporate E3 Series multiprocessor-based control panels, with Intelligent Loop Interface ILI-MB-E3 and RPT-E3 repeater modules communicating over peer-to-peer token ring network with capacity of up to 64 nodes.
  • Page 4 Scope of Work/Materials SUBMITTALS Comply with the following submittal procedures. Include sufficient information, clearly presented, to determine compliance with the specifications and the Drawings. Equipment Submittals: Cover Page: Indicate the following: Project name and address. Engineered systems distributor’s name and other contact information. Installing contractor’s name and other contact information.
  • Page 5: Quality Assurance

    Scope of Work/Materials Prepare using AutoCAD. Prepare to scale 1/8 inch = 1’-0”, unless otherwise required by the Architect or Engineer. Show equipment and device locations. Show wiring information in point-to-point format. Show conduit routing, if required by the AHJ. Title Block: Provide on each sheet and include, at a minimum, the following: Project name.
  • Page 6: Warranty

    Scope of Work/Materials NFPA 101. NFPA 750. NFPA 5000. ADA: System shall conform to American with Disabilities Act (ADA). Equipment, Programming, and Installation Supervision: Provide services of approved Engineered systems distributor of Gamewell-FCI for equipment, programming, and installation supervision. Provide proof of factory training within 14 calendar days of award of the Contract. Please contact Curtis Manganaan at 559-675-4534 Software Modifications: Provide services of Gamewell-FCI factory-trained and authorized technician to perform...
  • Page 7 Substitute equipment: None Madera Unified shall provide all Fire Alarm Equipment. DISTRIBUTED NETWORKED FIRE ALARM SYSTEM Distributed Networked Fire Alarm System: Gamewell-FCI E3 Series Expandable Emergency Evacuation Fire Alarm System. CONTROL PANEL HARDWARE For Installation Purpose Intelligent Control Panel: Supply user interface, including LCD or touch-screen 1/4 VGA display...
  • Page 8 Scope of Work/Materials Integral battery charger with capacity to charge up to 55 amp-hour batteries while under full load. Batteries: Sufficient capacity to provide power for entire system upon loss of normal AC power for a period of 24 hours with 15 minutes of alarm signaling at end of this 24-hour period, as required by NFPA 72, Local Systems.
  • Page 9 Scope of Work/Materials connection of modules up to 3,000 feet from cabinet. Each ILI-MB-E3’s RS-485 bus shall support up to 16 ASM-16 auxiliary switch modules, 6 LCD-E3 main annunciators, and 5 LCD-7100 annunciators. Peer-to-Peer Panel Configuration: All Loop Interface Modules shall incorporate own programming, log functions, Central Processor Unit, and control-by-event (CBE) programming.
  • Page 10 Scope of Work/Materials alarm system by Owner’s telephone contractor under separate contract. Owner will be responsible for phone company costs. Local Energy City Master Box Option: Fire alarm system shall be connected to local energy city master box. City master box shall be coded and timed in accordance with requirements of fire department.
  • Page 11 Scope of Work/Materials maintenance alert warning. When detector accumulates dust in chamber above allowed limit, control panel shall indicate maintenance urgent warning. NON-FIRE Alarm Module Reporting: Non-reporting type ID shall be available for use for energy management or other non-fire situations. NON-FIRE point operation shall not affect control panel operation, nor shall it display message at panel LDC.
  • Page 12 ANX-MR-FO (Addressable Node Expander Multi-Ring with Fiber Optic connectors) and ANX-MR-UTP (Addressable Node Expander Multi-Ring with Fiber Optic and Twisted Pair connectors) shall expand the E3 Series network from 64 nodes to 122 nodes. ANX-SR (Addressable Node Expander Single Ring) will function in single 64 node systems.
  • Page 13 Scope of Work/Materials SUPPLEMENTAL NOTIFICATION APPLIANCE CIRCUIT (HPFF8) Supplemental Notification Appliance Circuit (HPFF) shall be Model HPFF8 offering up to 8.0 amps (8.0 amps continuous) of regulated 24-volt power. HPFF shall include the following features: Integral Charger: Charge up to 18.0 amp-hour batteries and support 60-hour standby. 2 Input Triggers.
  • Page 14 Scope of Work/Materials Addressable Manual Stations (MS-7AF): Manual Fire Alarm Stations: Non-code, non-break glass type, equipped with key lock so they may be tested without operating handle. Operated Station: Visually apparent, as operated, at a minimum distance of 100 feet (30.5 m) from front or side.
  • Page 15 Scope of Work/Materials The detector shall be comprised of four sensing elements, including a photoelectric (light- scattering) particulate sensor, an electrochemical carbon monoxide (CO) sensor, a daylight-filtered infrared sensor and solid state thermal sensor(s) rated at 135°F (57.2°C). The device shall be able to indicate distinct smoke and heat alarms. The intelligent multi-criteria detection device shall include the ability to combine the signal of the photoelectric signal with other sensing elements in an effort to react quickly in the event of a fire situation.
  • Page 16 Scope of Work/Materials The sounder can be programmed to be silenced whenever a live page or active message is being played over the system. Intelligent Aspiration Smoke Detector (AAD-8100): The AAD-8100 shall offer Very Early Warning Smoke Detection, Early Warning Smoke Detection and Standard Smoke Detection settings.
  • Page 17 Scope of Work/Materials Mount in 4-inch (101.6-mm) square, 2-1/8-inch (54-mm) deep electrical box. IDC Zones: Suitable for Style B operation. LEDs: Flash under normal conditions, indicating monitor module is operational and in regular communication with control panel. Addressable Two Input and Two Output Modules (AMM-2RIF): Provide two isolated sets of Form-C contacts, which operate as a single pole double throw switch.
  • Page 18 Mount in factory-supplied MBB-2 or MBB-6 enclosure. LEDs: Flash under normal conditions, indicating monitor module is operational and in regular communication with control panel. SYSTEM PERIPHERALS – E3 SERIES 13850 (28 31 00) - 18 Bid No.041818-Installation of New Fire Alarm System at Adams Elementary School...
  • Page 19 Scope of Work/Materials Graphic Annunciator (Uses ANU-48 Serial Driver Board): Communicate to fire alarm control panel via EIA-485 (multi-drop) 2-wire communications loop. Up to 16 annunciator drivers, each configured up to 48 points, shall be connected per ILI-MB-E3. ANU-48: Provide interface to approved UL-listed graphic-style annunciator and provide each of the features specified.
  • Page 20: Installation

    Scope of Work/Materials Strobe Candela Rating: Determine by positioning selector switch on back of device. PART 3 EXECUTION EXAMINATION Examine areas and surfaces to receive fire alarm system. Notify Architect of conditions that would adversely affect installation or subsequent use. Do not begin installation until unacceptable conditions are corrected.
  • Page 21 Scope of Work/Materials Introduce on system each of the alarm conditions that system is required to detect. Verify proper receipt and proper processing of signal at Control Panel and correct activation of control points. Consult manufacturer’s manual to determine proper testing procedures when system is equipped with optional features.

This manual is also suitable for:

13850