Seascape NOVASUB DDG-P Quick Start Manual

Advertisement

Quick Links

NOVASUB - DDG-P QUICKSTART GUIDE - R1.1
Action
Description
• Connect both probe cables and probes to the SCC-DDG-P side

Installation

• Connect external 100-230 vac power

Power Up

Press Power button to start the DDG
• Place both sensors vertical together
Calibration
• Connect the measuring tap 0 on the measuring point of the sensors
preparations
• Make sure that both cables are long enough so that the pressure
1. Press Menu and go to Maintenance  Admin settingsLogin

Initial calibration

(Do the initial
calibration on each
2. Type password: OK+--+OK and OK again
new project
3. Go to Menu Calibrations in Admin settings Menu
location)
4. Select P1 and P2 and press OK
5. With Both pressure sensor in the air above and out of the water
6. Lower down both Pressure sensors to the max. calibration depth
7. Enter the value in millimetres , use + and – buttons to select value
8. Make sure pressure sensors are on the entered water depth, Press
9. Reboot the DDG-P
1. Press Menu and go to Maintenance  Admin settingsLogin Admin
Reference point
NAP-ref.
2. Type password: OK+--+OK and OK again
(Reference point of
3. Go to Menu Calibrations in Admin settings Menu
the project to which
4. Select Config NAP ref and press OK
p1 if referenced to)
5. Enter the value in millimetres , use + and – buttons to select value

Installing P1

P1 needs to be placed vertical in water approx. 0,5 m below water level
and deep enough that the water level never gets below the depth
sensor.

Level P1 settings

1. Login in Admin settings Menu
2. Go to Menu Calibrations in Admin settings Menu
3. Select Config Level P1 and press OK
4. Enter the value of Level-P1 in millimetres , use + and – buttons to

P-offset

The P-offset is fixed for the standard supplied UDS-2 sensor. Do not
change.

Logging

Manufactured by Seascape.nl
panel
sensors can be lowered to the max. calibration point
Admin
press, OK
and read the exact depth at the measuring tape water surface line.
and press OK to go to next digit. Press OK after last digit.
OK to set the WCcalMax.
and press OK to go to next digit. Press OK after last digit.
Measure the exact distance from bottom of P1 to NAP-ref. point
select value and press OK to go to next digit. Press OK after last
digit.
1. The "Dive monitor" shows " Press OK to start log" on the display
2. Start the next log by pressing OK
3. To log a point Press OK
4. Continue Pressing "OK" to log a new point
5. Stop logging by pressing "MENU" and "OK"
6. Logfile: X shows the file number and Point: x shows the point
number in the logfile. Each point is stored in the file with all data.
WWW.NOVASUB.COM
Needed
2x UDS-2 pressure
sensor with cables
Measuring tape
Measuring tape
R1.0
1 of 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the NOVASUB DDG-P and is the answer not in the manual?

Questions and answers

Summary of Contents for Seascape NOVASUB DDG-P

  • Page 1 5. Stop logging by pressing “MENU” and “OK” 6. Logfile: X shows the file number and Point: x shows the point number in the logfile. Each point is stored in the file with all data. WWW.NOVASUB.COM R1.0 1 of 2 Manufactured by Seascape.nl...
  • Page 2 NOVASUB - DDG-P QUICKSTART GUIDE - R1.1 WWW.NOVASUB.COM R1.0 2 of 2 Manufactured by Seascape.nl...

Table of Contents