Blaupunkt 5DB99450 Instruction Manual page 21

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 14
Air outlet – Recirculation Version
• Insert the Connector extensions 14.1 into the side of the Connector 15.
• Insert the Connector 15 into the Support bracket 7.3 and fix it with the
screws.
• Fasten the Support bracket 7.3, fixing it to the upper part with the
Screws.
• Make sure that the Connector extensions outlet 14.1 is in correspon-
dence with the Chimney openings both horizontally and vertically.
• Join the Connector 15 to the Hood canopy outlet using a rigid or flexi-
ble pipe ø¸150 mm, selection of which is at the discretion of the instal-
lation technician.
• Make sure that the Activated charcoal odour filter has been fitted.
Flue assembly - Mounting the hood body
• Position the upper chimney section and fix the upper part to the frame
using the 2 screws 12c (2,9 x 6,5) provided.
• Similarly, position the lower chimney section and fix the lower part to
the frame using the 2 screws 12c (2,9 x 6,5) provided.
Before fixing the hood canopy to the frame:
• Screw the 2 screws 12f half way into the holes provided in the sides of
the bottom of the frame.
• Remove the grease filters from the hood canopy.
• Remove any activated charcoal filters.
• Lift the hood canopy and engage the screws 12f in the slots (A) as far
as they will go.
• Working from below, fix the hood canopy to the frame (B), using the 4
screws 12q and 4 washers 22 provided, then tighten all the screws se-
curely.
ELECTRICAL CONNECTION
• Connect the Hood to the Mains Power Supply, inserting a bipolar
switch with a contact aperture of at least 3 mm.
• Remove the Grease filters (see paragraph "Maintenance") and make
sure that the Power cable (A) has been properly inserted into the
Suction fan socket.
• Fasten the connector B to the free socket at the side of the suction fan
EN
12c
7.3
14.1
15
7.3
12e
A
B
2
21

Advertisement

Table of Contents
loading

Table of Contents