Download Print this page

Modulex MMP-100F/30B/Z1/2 Installation Manual page 2

Advertisement

Available languages

Available languages

Lighting Fixture
Installation Guide
MUSEUM platform / Foundation downlight
MMP-100F/30B/Z1/2
Installation Details
Installation Diagram
Installation in New Construction
1
1
Locate fixture between joists.
Extend bar hangers to fit between 
2
joists. Position fixture by hammering 
Ceiling Line
nails into joists. Bar hangers should 
2
be level with bottom of joists.
Wiring connection
1
Provide electrical service according
2
to the "National Electrical Code" or
your local electrical code from a
suitable junction box to the
wiring box(located on the plaster
frame).
2
Remove the fixture wiring box
cover.
Remove appropriate round knock-
3
TO  0-10V DIMMER
out(s) and connect conduit to
wiring box with proper connect-
CAPPED 0-10V
CONTROL  WIRES
or(s)(not included).
3
Connect supply wires to wires in
fixture wiring box with proper size
wire nuts(not included).Be sure
DRIVER
to cover all bare current carrying
conductors.Connect white to white;
GREEN OR BARE
black to black; and  green or bare
copper wire(from electrical service)
to bare copper wire(in wiring box)
4
Place wires and connections back in
wiring box and replace cover.
Install the mounting equipment 
for ceiling cut out
1
Ceiling cut out
1
Cut out a hole and install the 
mounting frame
Φ100
2
Slide the metal fittings from upper 
side
3
Use a screw driver and tighten the 
metal fittings
On step 2, please fix the metal 
fitting firmly with your fingers. 
a
If not, it may cause falling of fixtures
Make sure to tighten the metal 
fittings securely with a screwdriver. 
b
(torque 1.0 〜2.0 N・m) If it is loose,
Metal fitting
 it may cause falling of the fixture
Caution
Bar hanger lip fits
against joist bottom
Make certain no bare wires are
exposed outside the connectors.
for metal conduit
*Wire nuts by  others.
WIRE NUT*
BLACK
BLACK
WIRE NUT*
WHITE
WHIT E
GREEN OR BARE
WIRE NUT*
a
Mounting frame
2
Ceiling
3
Push tight
Installation Details
Install with MINIMUM SPACINGS
between (a) center-to-center
of adjacent luminaires: 
600  mm ( 24̲ in); 
(b) top of luminaire to 
overhead building member: 
200 mm ( 8 in);
 (c) luminaire center to  side 
building member: 
300 mm ( 12 in)
Installation to ceiling
Install the safety wire to the 
1
mounting frame.
Install the fixture to the mounting 
2
frame.
h
Make sure to install the safety wire 
to the mounting frame securely.
Use clean soft cloth to clean up and 
i
maintain inner side of the body.
Make sure the fixture will not touch 
any objects in ceiling.
b
Remove fixture from a ceiling
1
match the slit of the mounting frame
slit with an cone slit
2
Insert a screwdriver in a slit and
take off fixture
3
 pull straight up the main body 
from an implantation frame
Standard to screw
torque 1.0〜2.0N・m
Installation Diagram
(a)
(a)
(c)
Safety wire
1
Ceiling
2
Mounting frame
fixture
1
Mounting frame
slit
Cone slit
Match positions
TOKYO
OSAKA
1-20-6 BF1 Ebisuminami,Shibuya-ku,
5-6-9 Shinosakadaiichi9F Nishinakajima,
R
Tokyo,150-0022,Japan
Yodogawa-ku,Osaka,532-0011,Japan
Tel : 81-3-5768-3681
Tel : 81-6-6305-3501
To install ModuleX safety
Caution
(b)
i
h
Mounting frame
Fixture
Safety wire
Inside
Clean gloves
2
Insert a screwdriver
in a slit
slit
 flat head 
screwdriver
FUKUOKA
1-8-30-1 Daimyou,Chuou-ku
Fukuoka,810-0041,Japan
Tel : 81-92-732-4211

Advertisement

loading
Need help?

Need help?

Do you have a question about the MMP-100F/30B/Z1/2 and is the answer not in the manual?