Page 1
A Division of Northern Star Industries, Inc. P.O. Box 787 Iron Mountain, MI 49801-0787 ISO 9001:2008 REGISTERED bossplow.com S N O W P L O W WBS15900 BROADCAST SPREADER OWNERS MANUAL MODEL WBS15800 ASSEMBLY OPERATION MAINTENANCE WARRANTY PARTS LIST...
Page 2
Assembly Handle Brace 1. Remove spreader and components from carton. Place Hopper on it’s front panel, insert two (2) 1/4-20 x 1/2” Hex Head Bolts through the Leg, flattened end of Handle Brace, and holes in Hopper as shown. Install Lockwashers and Nuts but leave them loose to ease 1/4-20 x 1/2”...
Page 3
Assembly 6. To check spreader for completed shutoff, pull the Handle Lever back to the “OFF” position. Turn spreader over to see if the Shutoff Bar completely covers the holes in the bottom of the Hopper. If not, stand the spreader upright on Wheels. Push the Handle Lever forward to the “ON”...
Page 4
For how long: 2 years parts and labor from the date of purchase. What BOSS Products will do: BOSS Products will, at its sole option, repair or replace defective parts at no charge. What you must do for warranty service: To obtain warranty service, purchaser must return the defective product to any authorized BOSS Products dealer (preferably the one from whom the product was purchased) within the warranty period.
Page 5
Part List Model WBS15900 Part of our service is providing replacement parts. Parts may be obtained through your local distributor. Be sure to give: 1. Spreader model number 2. Spreader name 3. Part number 4. Name of part as shown...
Need help?
Do you have a question about the WBS15900 and is the answer not in the manual?
Questions and answers