Download Print this page

Zest4Leisure Hollywood Swing with Canopy Assembly Instructions Manual

(w x d x h): 2.40m x 1.90m x 2.14m

Advertisement

Quick Links

V1-10.16
Assembly Instructions
(W x D x H): 2.40m x 1.90m x 2.14m
Product Name: Hollywood Swing with Canopy
Pressure Treated products should not be treated with any other products for the first month.
PLEASE KEEP THIS INSTRUCTION
Zest4Leisure
01352 752555 option 1 – sales@zest4leisure.co.uk

Advertisement

loading
Need help?

Need help?

Do you have a question about the Hollywood Swing with Canopy and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Zest4Leisure Hollywood Swing with Canopy

  • Page 1 V1-10.16 Assembly Instructions (W x D x H): 2.40m x 1.90m x 2.14m Product Name: Hollywood Swing with Canopy Pressure Treated products should not be treated with any other products for the first month. PLEASE KEEP THIS INSTRUCTION Zest4Leisure 01352 752555 option 1 – sales@zest4leisure.co.uk...
  • Page 2 60mm Screws 45mm Bolts, washers & nuts 100mm Bolts, washers & nuts 115mm Eye Bolts & small karabiner, washers & nuts 150mm Bolts, washers & nuts 150mm Eye Bolts & large karabiner, washers & nuts 990mm Chain 1140mm Chain www.zest4leisure.co.uk...
  • Page 3 Please take a few moments to check all pack contents listed. Assembly requires 2 persons. Tools required: Corded/Cordless Drill, Pozi-drive Bit/Screwdriver, Socket Set, Hammer, 3mm Drill Bit required in order for you to drill all screw holes before construction. Position 2no Legs A either side of Beam B (See Fig.1a), align bolt holes and attach using 1no 150mm Bolt, washer &...
  • Page 4 www.zest4leisure.co.uk...
  • Page 5 www.zest4leisure.co.uk...
  • Page 6 www.zest4leisure.co.uk...
  • Page 7 Tools required: Corded / Cordless Drill, 8mm Drill Bit, Adjustable Spanner, Pozi-drive Bit / Screwdriver, 3mm Drill Bit required in order for you to drill all screw holes before construction. The colour version of this document can be downloaded from: www.zest4leisure.co.uk/downloads/category/C1 Hollywood Swing with Canopy Pack List Item Description Quantity Brackets...
  • Page 8 Position canopy onto beam of swing assembly, drill 8mm holes in beam (through brackets) and fix using 3no 70mm bolts. (See Fig. 3) Fully tighten all nuts*. *Nuts may need re-tightening periodically dependent on weather conditions. Hollywood Swing with Canopy is now complete.
  • Page 9 www.zest4leisure.co.uk...