Download Print this page

Clenergy WATERTORQUE PV-ezRack SolarTerrace II-A Installation Manual

Advertisement

Quick Links

PV-ezRack SolarTerrace II-A
Installation Guide
Contents
1 Introduction................................................................................2
2 Tools & Components ...................................................................3
3 System overview.........................................................................4
4 Installation steps..........................................................................7
5 Notices and Safety Precautions.....................................................14
6 Project Case..............................................................................16
7 Service.....................................................................................17
Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au
Page 1 of 18

Advertisement

loading
Need help?

Need help?

Do you have a question about the WATERTORQUE PV-ezRack SolarTerrace II-A and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Clenergy WATERTORQUE PV-ezRack SolarTerrace II-A

  • Page 1: Table Of Contents

    2 Tools & Components ………………………………………………………….3 3 System overview……………………………………………………………….4 4 Installation steps………………………………………………………………..7 5 Notices and Safety Precautions………………………………..……………14 6 Project Case…………………………………………………………..……….16 7 Service……………………………………………………………….…………17 Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 1 of 18...
  • Page 2: Introduction

    PV array and PV-ezRack® SolarTerrace II-A™ components as required in AS/NZS 5033-2014 ADMT 2 2-2018. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 2 of 18...
  • Page 3: Tools & Components

    & M8 Hexagon Socket 19 mm socket Socket Screw) Screw) Measuring Tape String Marker Pen Wrench Electronic total Hydraulic driver station (optional) Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 3 of 18...
  • Page 4: System Overview

    T-Rail 105 Note: ER-PB-CP/D/A and ER-S-STIIA/D only used on STII double support mounting systems. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 4 of 18...
  • Page 5 STII-A, Post brace for C-Post/Post brace for C-Post On double support  STII-A, Post head for C-Post  T-Rail 110 Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 5 of 18...
  • Page 6 Step 5: PV modules installation Note: See steps below before beginning double support installation. It is similar to the single support systems. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 6 of 18...
  • Page 7 Installation Spacing Max Frame Spacing and Footing Options of Panel Dimensions 1.7m x 1m Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 7 of 18...
  • Page 8 *For SolarTerrace II-A driven post installation, maximum post height above ground is 1.3m. *For SolarTerrace II-A concrete pier installation, maximum post height above ground 1.5m. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 8 of 18...
  • Page 9 Bolt 1 lubricant if needed. Recommended torques: Bolt 1: 55 Nm Bolt 2 Bolt 2: 23 Nm   Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 9 of 18...
  • Page 10 M12 bolts and nuts supplied.   Recommended torque: 55 Nm     Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 10 of 18...
  • Page 11 M12 bolt and nut supplied. Recommended torque: 55 Nm Tube of the pre- assembled Post support Brace   Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 11 of 18...
  • Page 12 ④. Rotation the orientation of T head to in order to prevent the Tube Support can’t fit the post brace quite well. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 12 of 18...
  • Page 13 Tube Support T head Bolt 3 Bolt4 Bolt 3 Bolt 2 Bolt 3 Bolt 2 Bolt 2 Bolt 2 Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 13 of 18...
  • Page 14 6a. Note:   Connecting Rails Structure system are not recommended. 6c. Now the Racking System is completed. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 14 of 18...
  • Page 15 Tip: Use Inter Clamp U18 as the gap location. Recommended Torque: M8:20Nm 7b.The installation is complete. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 15 of 18...
  • Page 16: Notices And Safety Precautions

    Clenergy’s review prior modification for comment and approval. Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 16 of 18...
  • Page 17: Project Case

    6. Project Case Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 17 of 18...
  • Page 18 Watertorque Group Address: Lot 1 Brand Highway Muchea WA 6501 Phone: (08) 9195 0351 Email: nastec@watertorque.com.au Clenergy Australia | 1/10 Duerdin St, Clayton VIC 3168 | T: +61 3 9239 8088 | sales@clenergy.com.au Page 18 of 18...