Initial Operation / Assembly; Preperation; Assembly - deconta smart + Original Instruction Manual

Personnel lock system
Table of Contents

Advertisement

6.1. Preperation

Before assembling the personnel lock system:
-
Determine the exact location and floor plan
-
the underground must be clean and even

6.2. Assembly:

Place the floor elements flat in front of each other and insert the floor grids.
Note:
The sewage water connection of the shower chamber should have the shortest path to
the water management system in order to avoid unnecessary hose and cable lengths.
The mounting angles of the floor element must be cleaned before inserting the door and
side elements!
Insert the corner profile at the connecting corner of two floor elements into the receiving
angles and brace the quick-release fasteners to the ends of the corner profiles with the
floor elements.
Version 1
Instruction manual
Personnel Lock System smart +

6. Initial Operation / Assembly

Page 7

Advertisement

Table of Contents
loading

Table of Contents