Download Print this page
FloPlast AX110 Instruction Leaflet

FloPlast AX110 Instruction Leaflet

External air admittance valve
Hide thumbs Also See for AX110:

Advertisement

Quick Links

nstruction leaflet for AX110 External Air Admittance Valve
Benefits
G Removal of unsightly ventilation stack.
G Eliminates the need for the installer to work
& handle pipe above the roof line.
(Work at Height (WAHR) and Manual
Handling Regulations).
G Reduced installation time.
G Materials cost saving - bends, pipe, vent
cowl.
The Building Regulations, Document H1 sub
section 1.31, stipulates that any soil and vent
pipe installed externally within three metres of
any opening window, is required to terminate
a minimum of 900mm above the window.
This new development to the traditional
internal Air Admittance Valve allows a
soil stack fitted with an external Air Admittance
Valve to terminate within three metres of a
window opening. This allows the pipe to
terminate at the same height as if it were
installed internally i.e. 200mm minimum above
the highest wet entry point to the soil vent pipe.
(diagrams a & b).
The use of an external Air Admittance Valve
eliminates the need for the installer to work and
handle pipe above the roof line, making it
easier to comply with Work at Height (WAHR)
and Manual Handling Regulations.
building the future
Diagram a.
Diagram b.

Advertisement

loading

Summary of Contents for FloPlast AX110

  • Page 1 AX110 External Air Admittance Valve Benefits G Removal of unsightly ventilation stack. G Eliminates the need for the installer to work & handle pipe above the roof line. (Work at Height (WAHR) and Manual Handling Regulations).
  • Page 2 Maintenance Requirements To ensure the continued performance of the valve, FloPlast recommend that annual maintenance of the opening and closing mechanism is carried out. To achieve this: 1. Firstly, remove the lid by unscrewing anticlockwise. 2. Remove the separate ring holding the rubber seal (poppet).