Frame Up/Down; Pwb Assembly Loading - LG DVD5353 Service Manual

Table of Contents

Advertisement

DECK MECHANISM DISASSEMBLY
GUIDE UP/DOWN

5. Frame Up/Down

Note
Put the Base Main face down(Bottom Side)
• Unlock the Locking Tab(L3) and then lift up the Frame
Assembly Up/Down to separate it from the Base Main.
Note
• When reassembling move the Guide Up/Down in direction
of arrow(B) until it is positioned as Fig.(C).
• When reassembling insert (A) portion of the Frame
Assembly Up/Down in the (B) portion of the Guide
Up/Down as Fig.(B)
6. Belt Loading(Fig. 4-4)
7. Gear pulley (Fig. 4-4)
1) Unlock the Locking Tab(L4) in direction of arrow and then
separate the Gear Pulley from the Base Main.
GEAR LOADING
GEAR PULLEY
(L4)
BELT LOADING

PWB ASSEMBLY LOADING

(L6)
BASE MAIN
(A)
(L5)
FIG. (A)
(B)
GUIDE UP/DOWN
(L3)
BASE MAIN
(S5)
(A)
(B)
(B)
(A)
FIG. (B)
GUIDE UP/DOWN
FIG. (C)
Fig. 4-4
8. Gear Loading (Fig. 4-4)
9. Guide Up/Down (Fig. 4-4)
1) Move the Guide Up/Down in direction of arrow(A) as
Fig.(A)
2) Push the Locking Tab(L5) down and then lift up the
Guide Up/Down to separate it from the Base Main.
Note
When reassembling place the Guide Up/Down as Fig.(C)
and move it in direction arrow(B) until it is locked by the
Locking Tab(L5). And confirm the Guide Up/Down as Fig.(A)
10. PWB Assembly Loading
Note
Put the Base Main face down(Bottom Side)
1) Release 2 Screws(S5)
2) Unlock 1 Locking Tab(L6) and separate the PWB
Assembly Loading from the Base Main.
11. Base Main(Fig. 4-4)
4-4
FRAME UP/DOWN

Advertisement

Table of Contents
loading

Table of Contents