Page 1
PERI InSite Construction Data Acquisition System Instructions for Installation and Use – Technical Cabinet with Main Unit and Nodes – Version 1.1...
Technical Data ........................18 Operating Environment ....................18 Inputs and Outputs ......................18 Electrical Specifications ....................18 PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 3
Errors, possible causes and solutions ................... 45 Frequently Asked Questions ....................46 Disposal ....................... 47 Disposal of electronic components..................47 PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 4
Recycling of the Nodes ......................48 Annexes - RoHS, li-ion battery transportation regulation ......... 49 THIS SPACE WAS INTENTIONALLY LEFT BLANK PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Phone: +46(0)525-505 00 | Website: www.distant.se TRADEMARKS PERI InSite Construction is a brand name of PERI GmbH, Germany. Vemaventuri AB is a part of the PERI GmbH and therefore can be used interchangeably. Vemaventuri AB has made every effort to supply trademark information about company names, products and services mentioned in this manual.
1.2 Description of the User This document, (“the Instructions for Installation and Use”), is intended for personnel skilled in the field of concrete construction that use the PERI InSite Data Acquisition system (“the System”) in their line of work within the construction industry.
In such cases, the warranty will be voided. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Documentation, user instructions and technical information are provided with each Main Unit. Further documentation can be found under https://www.distant.se, https://www.peri.com or by contacting your local PERI subsidiary or check the PERI subsidiary website. Other languages This is the English Instructions for Installation and Use. For other languages, please contact your local PERI subsidiary.
Upload Rate, the time interval on which the node will upload data Connection Rate, the time interval on which the Main Unit will connect to the Internet PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Do not touch exposed signal connectors directly as it can damage them due to electrostatic discharge (ESD) from the human body. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
The System. The manufacturer is not responsible for any damage or unexpected results from unintended use of the equipment. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
The user safety information described in this Instructions for Installation and Use must be followed by the professionals using the System. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Class 9 Miscellaneous Goods. Dangerous Goods Regulations The packaging contains dangerous goods. Dangerous Goods Regulations Package containing Lithium Ion Batteries PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Use safety earbuds from harmful noise level. Protective shoes Protect the feet from piercing and heavy elements. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Nodes on the European market: Proprietary encrypted data transfer protocol: 868 MHz – 870 MHz The System shall be used in conjunction with the Web Portal and original PERI accessories such as thermocouple cable, type T. The information provided in this Instructions for...
3.3 System Overview The PERI InSite Construction Data Acquisition System (“the System”) consists of thermocouple (N-TE) and ambient climate or pressure (N-TRF) nodes paired with the Main Unit L-11 permanently mounted in the Technical Cabinet. The Technical Cabinet protects the Main Unit and serves as a charging station for the Nodes when they are not in operation of collecting data.
Rectangular box with extending components Mass/Dimensions (L×W×H) cm 48×30×21 cm Cable length 2.9 m Node charging cable length 10 cm PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Nodes contain a lithium ion battery that needs to be charged at regular intervals. A completely discharged battery requires approximately 12 hours of charging to regain full capacity. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 19
It is also possible to monitor the temperature in cooling or heating pipes so that the temperature difference between the inlet and outlet can be calculated. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Force Connect was successful all four LED indicator lamps will light up once. The node will then resume normal operation. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 21
3. The connected thermocouple is not properly short circuited in the measurement end. Thermocouples can be tested using the diode testing function of a multimeter. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 22
This way all nodes will automatically receive their setting at the same time and there will be no need to change the settings on each individual Node. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Web Portal. The buzzer plays a two-note signal to indicate that it will turn OFF after trying to connect a last time. “♩ ♪ ” PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 24
In this state no measured data is stored. Make sure a measurement session is active in order to collect and store data. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 25
0.2 s 0.2 s 0.2 s RED LED . . . ● ○ ● ○ ● ○ PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Do not use excessive force when installing the antennas or detaching the nodes or USB charging cable. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Node type N-TE. Follow the instructions in the aforementioned section to finish the installation. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 29
Select a project and a dashboard in the Insite web application and create a widget for the corresponding node. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 30
Approximately 12 mm is sufficient. PERI InSite Construction - Data Acquisition System...
Page 31
BOTTOM is the lowermost channel. When data is presented on the Web Portal these definitions are important to remember in order to evaluate the measured data. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
The thermocouples are normally not accessible after the pour. 4.2 Accessing the Web Application Login to www.peri.instite.app using your credentials, if you already have a user account otherwise create a new one and follow the instructions. 4.3 Creating a project and starting a measurement session To create projects and start measurement sessions you need to have the proper administrative rights.
Page 33
Click Save and send to the unit to make the new settings available to the Main Unit on its next connection. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 34
This could lead to serious risks! To set up pressure monitoring in the web application proceed analogously. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
5.1 Shutting down and finishing up Ending the measurement session Log in to www.peri.insite.app and click the red stop button on the actual measurement session. This will release the Main Unit and make it available for new projects. Collecting the nodes Collect all Nodes from their respective locations.
Be careful when lifting and handling the equipment. Do not overstrain back muscles and watch your feets. Figure 8 - Technical Cabinet PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 37
Use protective sheets between the units to prevent scratching the paint on the door. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Do not move the injured person unless the person is in immediate danger. d) Warn others of the possible electrical danger. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
In case of a deep head wound stop any excessive bleeding and immediately seek medical assistance. Always seek medical assistance if concussion or bone fractures are suspected. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
The mains cable should only be replaced by an authorized maintenance workshop. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 41
The System should only be repaired by specially trained service engineers and at manufacturers recommend places. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Parts of the equipment that remain energized after the disconnection might represent a hazard during servicing. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Pliers for preparation of thermocouple cable 135883 USB charging cable for nodes 135879 USB charger for nodes (EU) 135880 PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Technical Cabinet being uploaded Check Node settings and try to do a Force Connect PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Q: Why does the Node measure negative temperatures? A: Make sure the thermocouple is installed with right polarity. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
August of 2005. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Locate the lithium ion battery and recycle it separately according to the local regulatory requirements. The PCB should be recycled as electronic waste, the rest as plastic. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
10 Annexes - RoHS, li-ion battery transportation regulation Annex II RoHS Directive. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 49
The state of charge (SoC) on lithium batteries for transportation should be maximum of 30% of the full charge. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 50
1 other than division 1.4S, division 2.1, class 3, division 4.1 or division 5.1. Fig. IATA class 9 miscellaneous goods label PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 51
(ST/SG/AC 10/1/Rev.20) 2017. Part III, subsection 38.3 EUs directive 2013/56/EU must be considered for environment related laws of batteries. PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...
Page 52
Minor revision with additional features 2020-06-15 2.03 Minor revision Minor revision, Pressure sensors included, Web Application 2021-03-24 2.04 updated PERI InSite Construction - Data Acquisition System Instructions for Installation and Use - Technical Cabinet with Main Unit and Nodes – Preliminary Draft –...