Download Print this page

IBC EX 700 Quick Start Manual

Fuel conversion to natural gas (lp to ng) p-kit 1200

Advertisement

Quick Links

EX 700 - Fuel Conversion to Natural Gas
(LP to NG) P-Kit 1200
 
Note
If converting to propane, order the Propane Conversion Parts kit (IBC Part # P-1201) from your authorized IBC 
distributor.
Use the Natural Gas Conversion   k it if the fuel source at the site uses natural gas and the modulating boiler has been set 
up (factory fire-tested) to operate with propane. Check the rating plate on the boiler to see which fuel source the particular 
boiler has been set up with.
Using this conversion kit, a qualified technician will need to:
 1.  Perform a fuel conversion.
 2.  Perform a combustion test.
 3.  Fill in the information required on the fuel conversion labels, and affix them to the boiler after the conversion is 
completed.
Warning
This conversion kit shall be installed by a qualified service agency in accordance 
with the manufacturer's instructions and all applicable codes and requirements of 
the authority having jurisdiction. If the information in these instructions is not 
followed exactly, a fire, an explosion or production of carbon monoxide may result 
causing property damage, personal injury or loss of life. 
The qualified service agency is responsible for the proper installation of this kit. The 
installation is not proper and complete until the operation of the converted appliance 
is checked as specified in the manufacturer's instructions supplied with the kit.
The boiler will automatically de-rate the maximum input at a rate of approximately 2% per 1,000' above 4,500'. The gas 
valves zero governor will ensure that the gas-air mixture is not affected at altitude.
Included with the conversion kit:
1 x NG Mixer Assembly - IBC Part # 180-254
1 x   O -ring gas valve coupler- IBC Part # 150-001
4 x Hex bolt M5 x25 IBC Part # 150-354
4 x   F lat Washer, 0.562ID -   I BC Part # 150-025
4 x M6 Flat Washer   I BC Part # 150-159
6 x M8 Flat washer -     I BC Part # 150-339
This conversion involves changing the mixing assembly. 
120-334E-R1
4 x Hex bolt M6 x 14 SS -   I BC Part # 150-373
1 x Rating Plate Fuel Overlay -   I BC Part # 080-285A
1 x Gas Valve Conversion Label - IBC   P art # 080-107B
1 x Installer Identifier Label - IBC Part # 080-283A
6 x Hex bolt M8 x14   -    I BC   P art # 150-329
1 x O-ring EBM blower -   I BC   P art # 150-376
| 1

Advertisement

loading

Summary of Contents for IBC EX 700

  • Page 1 EX 700 - Fuel Conversion to Natural Gas (LP to NG) P-Kit 1200   Note If converting to propane, order the Propane Conversion Parts kit (IBC Part # P-1201) from your authorized IBC  distributor. Use the Natural Gas Conversion   k it if the fuel source at the site uses natural gas and the modulating boiler has been set  up (factory fire-tested) to operate with propane. Check the rating plate on the boiler to see which fuel source the particular  boiler has been set up with. Using this conversion kit, a qualified technician will need to:  1.  Perform a fuel conversion.  2.  Perform a combustion test.  3.  Fill in the information required on the fuel conversion labels, and affix them to the boiler after the conversion is  completed. Warning This conversion kit shall be installed by a qualified service agency in accordance  with the manufacturer’s instructions and all applicable codes and requirements of  the authority having jurisdiction. If the information in these instructions is not  followed exactly, a fire, an explosion or production of carbon monoxide may result  causing property damage, personal injury or loss of life.  The qualified service agency is responsible for the proper installation of this kit. The  installation is not proper and complete until the operation of the converted appliance  is checked as specified in the manufacturer’s instructions supplied with the kit. The boiler will automatically de-rate the maximum input at a rate of approximately 2% per 1,000' above 4,500'. The gas ...
  • Page 2 Figure 1 Gas valve and fan    Mixing device    Gas high pressure switch  Inlet gas pressure test port (location of)  Gas low pressure switch  Low fire adjustment (zero-offset)  High fire adjustment (on the side)  Shutoff valve...
  • Page 3: Fuel Conversion Instructions

    To perform a fuel conversion:  1.  Turn off the power and shut off the gas supply at the external gas shut-off valve.  2.  Remove the front door and top cover from the boiler.  3.  Remove the four (4) 5/16" hex bolts from the gas inlet to the mixing device. Carefully separate the two parts,   remove and retain the O-ring for re-assembly. (See   in image below).  4.  Remove the four (4) ¼" hex bolts that connect the mixing device to the air filter box. The gasket should remain  attached to the air filter box. (See   on image above).  5.  Use an Allen key to remove the Six (6) 6 mm   s crews connecting the mixing device to the fan. (See   in image  above).   C arefully separate the two parts,   r emove and retain the O-ring for re-assembly.   6.  Remove the propane mixing device.  7.  When Installing the new natural gas mixing device ensure that the O-ring is properly seated in the groove of the  fan. EX 700 - Convert to NG fuel (P-Kit 1200)
  • Page 4 Caution Failure to position the O-ring as indicated will result in a gas leak, and affect burner operation.  8.  Re-assemble in the reverse order of steps provided.  9.  Check for gas leaks. Combustion testing and adjustment Danger A combustion test checks that the gas valve is operating properly in the field. To perform a combustion test, you  must be a qualified, trained and licensed gas fitter. Making adjustments to the IBC gas valve without a properly calibrated gas combustion analyzer and by people  who are not trained and experienced in its use is forbidden. Failure to use an analyzer can result in an  immediate hazard. Model Number High Fire Input EX 700 700 MBH Table 1 Rated input of a converted boiler Normal ignition system sequence of operation: The boiler control, upon a call for heat or DHW, turns on the combustion fan for a 20-second pre-purge, then energizes the  spark electrode and gas valve for a 4-second trial for ignition. If the burner does not light, the process is repeated until the burner lights and flame is detected. After 3 trials for ignition, the  boiler locks out and will need to be manually reset by clearing the error on the touchscreen controller (Diagnostics >  Advanced Diagnostics > Clear Errors). The boiler   a utomatically resets after 60 minutes, if no action is taken. Combustion test target ranges The Low Fire (zero-offset) valve adjustment screw on the gas valve has been factory set. See ...
  • Page 5: Testing And Adjusting

    8.2 – 9.2 Propane  < 250 10.3 – 11.3 10.8 9.3 – 10.3 Table 2 Combustion test target ranges - CO / Maximum CO  1.  After the boiler is lit and is at high fire, insert the combustion analyzer test probe into the flue gas test port. Then  adjust the high fire (gas-air ratio) adjustment with a small slot screwdriver according to Table 2  values.   T his  adjustment screw is very sensitive and will only need very small adjustments to fine tune the gas valve (1/16 of  a turn at a time only). Turn counter-clockwise (in the direction of the '+' sign) to raise the CO 2 % (to richen). Turn  clockwise to lower CO 2 %. EX 700 - Convert to NG fuel (P-Kit 1200)
  • Page 6 Figure 2 Flue gas test port  2.  Set the heat-out value in manual mode to the minimum MBH for the boiler (see Table 1  3.  Low fire adjustment - adjust the low fire according to Table 2 .   U se a 2.5 mm Allen key. Turn counter-clockwise (in  the direction of the '+' sign) to raise to raise the CO 2 % (to richen). Turn clockwise to lower CO 2 %. Start with 1/8 of a  turn until you see the analyzer measure a change then only make 1/16 adjustments.   I f changing direction on this  adjustment you will notice a significant backlash (requirement for 1/8 turns until you see the analyzer measure a  change.  4.  Run the boiler to high fire, and check the results to confirm correct settings.   Note Clock the gas meter   t o confirm full maximum rating plate input. Check the measured results with Table 1  5.  Run the boiler to low fire, and check the results to confirm correct settings.  6.  Restore the load to the previous load type. Unless you changed the load high limit, all the programmed settings will  be restored and the load will operate as before. Confirm a smooth ignition sequence.  7.  Turn off the gas supply at the external gas shut-off valve.  8.  Disconnect the power to the boiler.  9. ...
  • Page 7 Place the conversion labels onto the boiler at the positions indicated on Where to place conversion labels on the boiler on page Clocking the meter (Natural Gas)  1.  Turn off all other appliances and pilots.  2.  Turn on the boiler and set the boiler to high fire.  3.  Ensure the boiler has a large load to heat, so that the boiler will not shut off.  4.  With a Stop-Watch, record the number of seconds for the smallest dial to make 1 full revolution.  5.  CFH = (3600 x Dial Size) / Seconds.  6.  CFH x 1000 (check local Btu content) = Input Btu’s.   Note For 2 PSI meters multiply CFH x 1.097 For Metric meters multiply CFH x 35.3 For 2 PSI metric meters multiply CFH x 1.097 x 35.3 For Altitude above 4,500’ deduct 2% per 1,000’ of altitude from the Input Btu’s. EX 700 - Convert to NG fuel (P-Kit 1200)
  • Page 8 Where to place conversion labels on the boiler  ...

This manual is also suitable for:

P-1200