BOH Enviromental FPU SYSTEMS 99000457-UG Operation Manual

Containerized 5 person shower

Advertisement

Quick Links

(INCLUDING REPAIR PARTS & SPECIAL TOOL LIST)
BOH-PM-04-1
Chapter 1 Rev. 2.00
FPU
®
SYSTEMS OPERATION MANUAL
BOH CONTAINERIZED 5 PERSON SHOWER
BOH FPU Field Pack-up Units
BOH CONTAINERIZED SHOWER
BOH FPU
BOH ENVIRONMENTAL LLC
143 Terra Bella Blvd.
Covington, LA 70433
POC Doug Cresap (985) 674-0725
http://www.bohfpusystems.com
Systems
®
© 2016 BOH Environmental LLC

Advertisement

loading
Need help?

Need help?

Do you have a question about the FPU SYSTEMS 99000457-UG and is the answer not in the manual?

Questions and answers

Summary of Contents for BOH Enviromental FPU SYSTEMS 99000457-UG

  • Page 1 ® SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units BOH CONTAINERIZED SHOWER BOH FPU Systems ® BOH ENVIRONMENTAL LLC 143 Terra Bella Blvd. Covington, LA 70433 POC Doug Cresap (985) 674-0725 http://www.bohfpusystems.com BOH-PM-04-1 ©...
  • Page 2 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 3 WARNING SUMMARY This warning summary contains general safety warnings and hazardous materials warnings that must be understood and applied during operation and maintenance of this equipment. Failure to observe these precautions could result in serious injury or death to persons using equipment. WARNING Do not allow the system to swing if using an overhead lift.
  • Page 4 WARNING SUMMARY This warning summary contains general safety warnings and hazardous materials warnings that must be understood and applied during operation and maintenance of this equipment. Failure to observe these precautions could result in serious injury or death to persons using equipment. WARNING When using a crane to lift the Containerized Shower, ensure the proper sling and sling point are used.
  • Page 5 GENERAL WARNINGS HEAVY PARTS - heavy object on human figure shows that heavy parts present a danger to life or limb. HEAVY PARTS - heavy object pinning human figure against wall shows that heavy, moving parts present a danger to life or limb. HEAVY PARTS - hand with heavy object on top shows that heavy parts can crush and harm.
  • Page 6 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 7 SYSTEMS OPERATION MANUAL ® (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units REPORTING ERRORS & RECOMMENDING IMPROVEMENTS You can help improve this manual. Please let us know if you find any mistakes or if you know of a way to improve the procedures.
  • Page 8 ------------------------------------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------------------------------------ CHAPTER 5 – UNIT MAINTENANCE INSTRUCTIONS Door Assembly and Rivet Replacement ......................0023 00 Vanity Magnetic Door Latch ........................... 0024 00 Vent Fan ................................ 0025 00 Light Fixture ..............................0026 00 Water Heater ..............................0027 00 Electrical System ............................0028 00 Sink, Faucets and Shower Head ........................
  • Page 9 HOW TO USE THIS MANUAL This manual contains general information, operating instructions, Preventative Maintenance Checks and Services (PMCS), and maintenance/repair instructions for the BOH Containerized Shower Units. Front matter consists of front cover, warning summary, title block, table of contents, "how to use this manual" pages, and provides information on the associated equipment.
  • Page 10 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 11 ® SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units CHAPTER 1 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 12 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 13 0001 00 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION SYSTEMS OPERATION MANUAL ® (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units GENERAL INFORMATION SCOPE Equipment Covered This technical manual contains instructions for the operation, preventive maintenance, and recommended Unit/Direct Support corrective maintenance for the BOH Containerized Shower System and the associated equipment.
  • Page 14 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 15 0002 00 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION SYSTEMS OPERATION MANUAL ® (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units THEORY of OPERATION Containerized Shower System Description The Containerized Shower can be quickly unloaded from a transport vehicle and established on a site that has water and electrical service available.
  • Page 16 This page was intentionally left blank BOH-PM-04-1 Chapter 1 Rev. 2.00...
  • Page 17 0003 00 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION ® SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units EQUIPMENT CHARACTERISTICS, COMPONENTS AND FEATURES CONTAINERIZED SHOWER LAYOUT BOH-PM-04-1 Chapter 1 Rev. 2.00 0003 00-1...
  • Page 18 0003 00 Shower Top View Layout NOTE The electrical and water connection end is recessed 3” to keep within the container profile. Ground rod and strap assembly and city water valve are stored in the utility room. Electrical and water Supply End Utility Room BOH-PM-04-1 Chapter 1 Rev.
  • Page 19 0003 00 Containerized Shower Exterior Water and Electrical hook-ups Circuit Panel Box, 120/240 Volt 1 Phase 40 AMP, NEMA 3R (1) Weather Proof Exterior GFCI Receptacle (2) Ground rod and strap are stored in the left corner of the utility room. Ground Lug (3) 1”...
  • Page 20 0003 00 Grey Water Cleanout NOTE The Grey Water Cleanout (1) is located on the opposite end from the Load Center and water hookups. END OF WORK PACKAGE BOH-PM-04-1 Chapter 1 Rev. 2.00 0003 00-4...
  • Page 21 0004 00 INTRODUCTORY INFORMATION WITH THEORY OF OPERATION ® SYSTEMS OPERATION MANUAL (INCLUDING REPAIR PARTS & SPECIAL TOOL LIST) BOH CONTAINERIZED 5 PERSON SHOWER BOH FPU Field Pack-up Units EQUIPMENT DATA LABELS, IDENTIFICATIONS, MARKINGS Manufacturers Data Plates Location (All 4 Sides) Example BOH-PM-04-1 Chapter 1 Rev.
  • Page 22 0004 00 Other Identifications and Markings REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR) If your Containerized Shower needs improvements in design and/or performance, let us know. Send a description of the recommended change to dcresap@bohfpusystems.com. CORROSION PREVENTION AND CONTROL (CPC) It is our understanding that Corrosion Prevention and Control (CPC) is a continuing concern for the military.